background image

 

 

Connections to start the equipment by relay transmission of  power supply:  

 

 

 

 

 

 

 

 

 

 

 

 
 

Connect one end from power supply straight to the actuator i.e electrical motor, solenoid, a.s.o.). Connect the other one 
to pin 1 (COM 1) of J2 connector.   
If operation mode is “normally open”, take a wire to the actuator from pin 2 (N.O. 1). These wires must be able to 
sustain 10 Amps current draw. 
If operation mode must be “normally closed”, take a wire to the actuator from pin 3 (N.C. 1).  

 
Connections to start the equipment by one clean relay switch: 
 

 

 

 

 

 

 

 

 

 

 
 

Take a wire to the actuator from pin 1 (COM 1) of the J2 connector.   
If operation mode is “normally open”, take another wire to the actuator from pin 2 (N.O. 1).  
If operation mode must be “normally closed”, take such wire from pin 3 (N.C. 1).  

 

To/from pulse 
coin validator 
signal on PIN10            

   OUT 1: LINE A, N.O. 

 IN 1: C1 LINE A 

   OUT 2: LINE B, N.O. 

 IN 2: C2 LINE B 

DISABLE: Vac L or Vcc + 

 

DISABLE: Vac N or Vcc - 

 POWER IN: GND (ac) 

 POWER IN: 230Vac, 

or

 

24Vac, 

or

 +24Vdc, 

or

 +12Vdc 

POWER IN: N (ac) 

or

 - (dc) 

   OUT 2: LINE B, N.C. 

   OUT 1: LINE A, N.C. 

POWER TO 

EQUIPMENT: 

230Vac, or 24Vac, or 

+24Vdc, or +12Vdc 

To/from pulse 
coin validator: 
signal on PIN10            

   OUT 1: LINE A, N.O. 

 IN 1: C1 LINE A 

   OUT 2: LINE B, N.O. 

 IN 2: C2 LINE B 

 POWER IN: GND (ac) 

 POWER IN: 230Vac, 

or

 

24Vac, 

or

 +24Vdc, 

or

 +12Vdc 

POWER IN: N (ac) 

or

 - (dc) 

   OUT 2: LINE B, N.C. 

   OUT 1: LINE A, N.C. 

EQUIP

MENT 

INH  – 

 

INH + 

 

N.C. 2 

 

N.O. 2 

 

COM 2 
N.C. 1 
N.O. 1 

COM 1

 

 

INH  – 

 

INH + 

 

N.C. 2 

 

N.O. 2 

 

COM 2 
N.C. 1 
N.O. 1 

COM 1

 

  + / L 

  

 

  - / N 

 

  GND

 

  

+ / L 

  

 

  - / N 

  

 

  GND 

DISABLE: Vac L or Vcc + 

 

DISABLE: Vac N or Vcc - 

EQUIPMENT

 

Содержание Timebox S

Страница 1: ...ACTIVE ONE ALBERICI Istruzioni Originali Rev 1 00 Pagina 1 Operator s manual A B Timebox S 1 line pay for time system Operator s manual Rev 1 03...

Страница 2: ...it is not possible to assure at any time the exact correspondence of the descriptions to the product features Alberici SpA shall not be held liable by the User for any damage losses or third party cl...

Страница 3: ...5 4 Electrical connections 5 5 Operation 7 6 Disposal of the product 7 7 Terms of Guarantee 7 8 Customer Service 7 STORICO REVISIONI Revisione n Data Modifica Note Creazione 1 00 06 11 08 Creazione Re...

Страница 4: ...stalled outdoor provided it is located in a position conveniently sheltered from unfavourable weather conditions 2 2 Available functions Payment and automatic activation of service Accounts audits fro...

Страница 5: ...ceptor sends out the credit signal A 10p flat cable connects the acceptor to the Servo board This one is also connected to the Timebox chassis by a Ground terminal Power the Servo board on the 3p sock...

Страница 6: ...r wire to the actuator from pin 2 N O 1 If operation mode must be normally closed take such wire from pin 3 N C 1 To from pulse coin validator signal on PIN10 OUT 1 LINE A N O IN 1 C1 LINE A OUT 2 LIN...

Страница 7: ...of sale All communications referring to guarantee repairs or replacements must be accompanied by the product serial number and the copy of the sale invoice To obtain your guarantee repair please send...

Страница 8: ...8...

Страница 9: ...ACTIVE ONE ALBERICI Istruzioni Originali Rev 1 00 Pagina 9...

Страница 10: ...10...

Страница 11: ...Istruzioni Originali Rev 1 00 Pagina 11 Alberici S p A reserves the right to modify at any time and without notice the technical specs of the unit to the aim of continually pursuing the improvement of...

Страница 12: ...ri per videogames e macchine vending Design and manufacture of payment systems accessories for videogames and vending machines Via Ca Bianca 421 40024 Castel San Pietro Terme BO ITALY Tel 39 051 944 3...

Отзывы: