Albalá Ingenieros | Manual
SEM2000C01
4. OPERATION
This section describes the significance of the front panel indicators of the SEM2000C01
module and their remote control and monitoring ability.
4.1. Front panel description
The appearance of the front panel and the elements it contains are shown in the
following illustration.
Front panel of the SEM2000C01
In addition to the connectors previously described in the Interconnection section the
front panel includes the following indicators and controls:
Each of the two electrical ports has an associated green LED that lights up when the link
operates at 1Gbit/s, stays off for other datarates and a yellow LED that both lights up to
indicate that the link has been established and blinks when there is activity. The optical
port has a single associated yellow LED that lights up when the link has been
established.
The REF. LED lights up in green when the presence of a 10MHz signal is detected on the
rear bus. Otherwise this LED lights up in red.
15
Содержание SEM2000C01
Страница 2: ...SEM2000C01 ...
Страница 4: ...SEM2000C01 ...
Страница 7: ...Albalá Ingenieros Manual SEM2000C01 1 3 Block diagram 7 ...
Страница 8: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 8 ...
Страница 10: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 10 ...
Страница 20: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 20 ...
Страница 22: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 22 ...
Страница 24: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 24 ...
Страница 26: ...Albalá Ingenieros S A Medea 4 28037 Madrid Spain 34 913274453 www albalaing com info albalaing com ...