Albalá Ingenieros | Manual
IMB2000C01
4. OPERATION
This section describes the significance of the front panel indicators of the IMB2000C01
module and their remote control and monitoring ability.
4.1. Front panel description
The appearance of the front panel and the elements it contains are shown in the
following illustration.
Front panel of the IMB2000C01
In addition to the connectors previously described in the Interconnection section the
front panel includes the following indicators and controls:
MADI: This LED lights up in green (OK) to indicate that a MADI signal with the correct
format is being received.
This LED lights up in red (FAIL) when either no MADI signal is being received or if
the format is incorrect.
If this interface is not being used, its status LED can be disabled by turning off the
corresponding reception mask.
15
Содержание IMB2000C01
Страница 2: ...IMB2000C01 ...
Страница 4: ...IMB2000C01 ...
Страница 7: ...Albalá Ingenieros Manual IMB2000C01 1 3 Block diagram 7 ...
Страница 8: ...Albalá Ingenieros Manual IMB2000C01 IMB2000C01 8 ...
Страница 10: ...Albalá Ingenieros Manual IMB2000C01 IMB2000C01 10 ...
Страница 14: ...Albalá Ingenieros Manual IMB2000C01 IMB2000C01 14 ...
Страница 32: ...Albalá Ingenieros Manual IMB2000C01 IMB2000C01 32 ...
Страница 34: ...Albalá Ingenieros Manual IMB2000C01 IMB2000C01 34 ...
Страница 36: ...Albalá Ingenieros S A Medea 4 28037 Madrid Spain 34 913274453 www albalaing com info albalaing com ...