OPERATION
PVB-PVS 08/20
Operation Section 4-10
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
7.2 Soil Pulverizer Pre-Operation Inspection/Service
Before each use, a complete inspection and service is required to ensure the Pulverizer is in good and safe
working condition. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure
the implement is ready for operation, conduct the following:
7.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
•
Tire condition/air pressure
•
Wheel lug bolts
•
Steering linkage
•
PTO shield
•
SMV sign is clean and visible
•
Tractor’s lights are clean and functional
•
Tractor Seat belt is in good condition
•
Tractor ROPS is in good condition
•
ROPS is in the raised position
•
No tractor oil leaks
•
Radiator free of debris
•
Engine oil level and condition
•
Engine coolant level and condition
•
Power brake fluid level
•
Power steering fluid level
•
Fuel condition and level
•
Sufficient lubrication at all lube points
•
Air filter condition
OPS-U-0030
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Содержание BUSH HOG PVB
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 16: ...SAFETY PVB PVS 08 20 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Description...
Страница 18: ......
Страница 19: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 23: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 25: ...Operation Section 4 1 OPERATION SECTION...
Страница 46: ......
Страница 47: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 49: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 3 MAINTENANCE 2020 Alamo Group Inc...
Страница 51: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 5 MAINTENANCE 2020 Alamo Group Inc...
Страница 52: ......
Страница 54: ...PVB PVS PULVERIZER 08 20 P N 95161 Printed U S A PVB PVS PULVERIZER...