OPERATION
PVB-PVS 08/20
Operation Section 4-9
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
6.1 Attaching Pulverizer to Tractor
The pulverizer should be placed on level ground.
Place the tractor rockshaft control in ‘position
control’ (non-floating) for attaching and detaching
the rear mounted pulverizer. ‘Draft control’ or
‘position control’ can be used while operating.
Back the tractor until the ends of the lift arms can
be attached to the lift points on the implement.
Secure the lift arms to the mast.
Attach the center link to the top of the mast and
adjust so that the implement frame will be level in
the operating position.
IMPORTANT: Scan this QR Code with your smart phone to link to the PAMI Safe
Implement Hitching Manual for more information on correctly connecting
agricultural tractors to implements. Or type in your internet browser the following
web address: www.algqr.com/hme
Ops-0008-MISC
7. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided.
OPS-U-0029
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Содержание BUSH HOG PVB
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 16: ...SAFETY PVB PVS 08 20 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Description...
Страница 18: ......
Страница 19: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 23: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 25: ...Operation Section 4 1 OPERATION SECTION...
Страница 46: ......
Страница 47: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 49: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 3 MAINTENANCE 2020 Alamo Group Inc...
Страница 51: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 5 MAINTENANCE 2020 Alamo Group Inc...
Страница 52: ......
Страница 54: ...PVB PVS PULVERIZER 08 20 P N 95161 Printed U S A PVB PVS PULVERIZER...