Translation from the original operating instruction
26
AL-KO AIR HEATER COMFORT
9.1
Contact person
Please address all questions in connection with our products to the installer of your air system, to one of our branches
or directly to:
AL-KO THERM GMBH
Tele-
phone:
(+49) 8225/ 39-0
Hauptstraße 248-250
Fax:
(+49) 8225/ 39-2113
89343 Jettingen-Scheppach
E-mail:
Germany
Web:
www.al-ko.com
9.2
General faults
Fault
Possible cause of fault / action
Only cold air is blown out
There is air in the cycle
Bleed the heating system
10. Shut-down
10.1 Decommissioning
Switch the system to a voltage-free state (all poles disconnected) and secure it against unauthorised switching on before
any work is performed.
Caution!
Some parts of the system are pressurised.
Caution!
In winter, there is a risk that individual components might freeze.
Take appropriate steps, e.g. fill in anti-freeze, as required.
The system must always be bled before re-operation and the points listed in the Maintenance chapter must be adhered
to.
10.2 Dismantling
Switch the system to a voltage-free state (all poles disconnected) and secure it against unauthorised switching on before
any work is performed.
Caution!
Some parts of the system are pressurised.
The dismantling may only be performed by trained specialist staff.
The dismantling must be performed according to the relevant work and accident prevention regulations valid at the time.
10.3 Disposal
Do not dispose of work out devices as domestic waste!
The relevant, local environmental and recycling regulations valid in your country and your municipality at
the time must be adhered to when disposing of the air heater, the operating materials and the accessories.