39Nm
29ftlb
19
)
i
JX
r
H
)
i
JX
r
H
2
Tighten the reduction nut to the link pipe
)
i
JX
r
H
.
4.
6
lide the link pipe onto the collectors and attach the springs
)
i
JX
r
H
2
.
)
or
(
vo
OX
tio
Q
H[
ha
XV
t o
QO\
:
coat the
interior side of the input bushes of the titanium link pipe
Z
ith Akrapovic ceramic anti-sei
]
ing grease
Z
hite tube
.
:$51,1*
: mak
H
VX
r
H
that
V
pri
QJV
p
XOO
th
H
O
i
Q
k pip
H
a
OO
th
H
wa
\
o
Q
to th
H
co
OOH
ctor
V
±
XVH
r
XEEH
r ma
OOH
t i
I
QH
c
HVV
ar
\
to tap th
H
co
QQH
ctio
QV
i
Q
to p
O
ac
H
5.
Содержание S-H10R6L-TC
Страница 10: ...www akrapovic com 10 iJXrH iJXrH ...
Страница 11: ...11 iJXrH 5 iJXrH 6 ...
Страница 12: ...www akrapovic com 12 iJXrH iJXrH ...
Страница 13: ...13 iJXrH iJXrH 20 ...
Страница 30: ...www akrapovic com ...