Three Phase and Three Phase CT Type PMSFL User Manual - 3
� Do not connect while circuit is live (hot).
Do not connect the meter to a 3 phase - 400VAC – network.
Place or install the meter only in dry surroundings.
Do not mount the meter in an explosive area or expose the meter to dust, mildew and
insects.
Make sure the wires are suitable for the maximum current of this meter.
Make sure the AC wires are connected correctly before activating the current/voltage
to the meter.
Do not touch the meter connecting clamps directly with metal, blank wire and your
bare hands as you may recieve an electrical shock.
Make sure the protection cover is in place after installation.
Installation, maintenance and reparation should only be done by qualified personnel.
Never break the seals and open the front cover as this might influence the function of
the meter, and will void the warranty.
Do not drop, or allow strong physical impact on the meter as the high precisely
components inside may be damaged.
Disclaimer
We have checked the contents of this publication and every effort has been made to ensure that
the descriptions are as accurate as possible.
However, deviations from the description cannot be completely ruled out, so that no liability can
be accepted for any errors contained in the information given. The data in this manual is checked
regularly and the necessary corrections are included in subsequent editions.
The Three Phase PMS can be mounted on a standard DIN rail (see above).