– 36 –
7
1
1
2
3
4
5
6
7
8
9
4
G DECK C.B
A MAIN C.B
RVS
FWD
SFR351 SFR352
SFR1
TP8
(L)
GND
TP9
(R)
J101
ADJUSTMENT < DECK / TUNER / FRONT >
<DECK SECTION>
1. Adjusting Tape Speed (DECK 2)
Requirements
•
Measuring Device: WOW & FLUTTER Meter (Frequency Counter)
Test Tape: TTA-100 (3 kHz)
Test Point: HP OUT (J101)
Adjustment Point: SFR 1
1) Connect the WOW & FLUTTER Meter to the HP OUT.
2) Insert the test tape (TTA-100) into DECK 2, FWD playback the centre of the tape and adjust SFR1 until
it becomes 3,000 Hz
±
5 Hz.
3) RVS playback and check that
±
45 Hz is added according to the FWD speed.
2. Checking Tape Speed (DECK 1)
Requirements
Same as number 1
1) Insert the test tape (TTA-100) into DECK 1, playback the centre of the tape and check that the speed is
within
±
45 Hz according to the speed of DECK 2.
WOW &FLUTTER METER
HP OUT
INPUT
Hz
%
Содержание NSX-SZ900
Страница 14: ... 14 SCHEMATIC DIAGRAM 1 MAIN 1 6 P SUPPLY SECTION ...
Страница 15: ... 15 SCHEMATIC DIAGRAM 2 MAIN 2 6 FUNCTION SECTION ...
Страница 16: ... 16 SCHEMATIC DIAGRAM 3 MAIN 3 6 AMP SECTION ...
Страница 17: ... 17 SCHEMATIC DIAGRAM 4 MAIN 4 6 DECK SECTION HEAD 1 HEAD 2 ...
Страница 18: ... 18 SCHEMATIC DIAGRAM 5 MAIN 5 6 DSP SECTION ...
Страница 19: ... 19 SCHEMATIC DIAGRAM 6 MAIN 6 6 TUNER SECTION ...
Страница 22: ... 22 SCHEMATIC DIAGRAM 7 FRONT KEY DECK ...
Страница 24: ... 24 SCHEMATIC DIAGRAM 8 AMP 3M ...
Страница 26: ... 26 SCHEMATIC DIAGRAM 9 PANORAMA AMP ...
Страница 28: ... 28 SCHEMATIC DIAGRAM 10 PT ...
Страница 30: ... 30 FL BJ815GNK GRID ASSIGNMENT PIN CONNECTION ANODE CONNECTION GRID ASSIGNMENT PIN CONNECTION ...
Страница 31: ... 31 ANODE CONNECTION NOTE UP DOWN ...
Страница 32: ... 32 IC BLOCK DIAGRAM ...
Страница 33: ... 33 ...
Страница 47: ...2 11 IKENOHATA 1 CHOME TAITO KU TOKYO 110 JAPAN TEL 03 3827 3111 Printed in Singapore 2000075 921338 ...