5
EN
Elements and Installation
MAIN CONTROL BOARD (AZCE6CB1IAQ)
Assembly
Connection
The system's main control board is already installed in the plenum.
AI1 DI1
O1
O2
AZ1 AZ2 AZ3
N L
IAQ
SW1
IU
DM1
IO1 IO2 IO3 IO4 IO5 IO6 IO7
IO8
ON/OFF MODULE
P3
For further information, see the
.
To connect the Airzone connection bus, there are three 5-pin terminals. This system allows star
and bus connection. Use 2x0.5 + 2x0.22 mm
2
Airzone cable. Fix the cables with the screws on
the terminal, following the color code.
Important:
For elements with external power supply at 110/230 VAC, it is only necessary to
connect poles "A" and "B" of the bus for communications.
For increased safety, fix the cables to the main control
board using the turrets:
AZ1 - AZ2 - AZ3
The Airzone connection bus is used to connect all the internal elements independent of the
main control board and can control up to 8 zones.
Important:
If you have a Flexa 4.0
system, you have the option of
incorporating a zone On/Off control
module (AZCE6ACCOFF) on the
main control board.
For further information on the On/
Off module, see the
.