8 refrIGerANT pIpING
8.1 Installation synopsis
Field pipes can be installed in three directions, this character increases the flexible of installation.
Chart
17
Chart
18
1 Connecting liquid pipe (field supply)
A the front
2 Connecting gas pipe
B the rear
3 Front plate
C the side
● Please knock out the hole as shown in the figure. Do not remove the pipe cover from the cabinet so that the
knockout hole can be easily punched. To knock out, it is easily taken off by hands by punching a position at the
lower side of 3 connected parts with screwdriver along the guide line.
● After marking the knockout hole, remove the burr and mount the attached protective bush and guard material
for pass-through part in order to protect pipes and wires.
knockout for
Power
supply
wiring
knockout for
refrigerant piping
1
2
3