12
12.1.2. WATER TEMPERATURE PROBE INSTALLATION
The SW probe is already wired at the factory.
1. Cut the power supply to the unit.
2. Fit the probe onto the water inlet pipe.
3. Cover the connection with a protective sheath.
INSULATE IMPERATIVELY
12.2. VENTILATION SPEEDS
The cassettes are supplied with 3 fan speeds, wired according to the model. Depending on the application, it is
possible to select from the 6 speeds, by connecting the motor wires on standby.
The disconnected, unused wire must be isolated in accordance with best electrical
wiring practices.
Manual reset
12.3. ELECTRIC HEATING
The electric heating system is equipped with 2 SAFETY
DEVICES. One is reset automatically, the other is manually
reset. They cut off electrical supply to the heating resistances
as soon as an operating anomaly is detected.
The electrical coil must never operate
without the fan turning.
12.4. FAULT WARNING REPEATER
When the upper water level is reached (SB2 detector), the pump electronic logic control shuts down ventilation,
heating and the cooling valve with one of its wires connected to terminal 2.
A default relay (KD) or a warning light (I max 4A / 250 V) can be connected to terminal 6 (230 V NEUTRAL potential).
Provide electrical supply to the system on the same phase and coming from the same
circuit protection device as the cassette.
Содержание K 12 OG LN
Страница 2: ......
Страница 25: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO...
Страница 31: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO VII 9 2T 12 2T 18 2T 9 4T 12 4T 18 4T...
Страница 32: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO VIII...
Страница 33: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO IX AQUANET 9 2T 12 2T 18 2T 9 4T 12 4T 18 4T...
Страница 34: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO X...
Страница 44: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XX...