9.13
RECOMMENDED PERIODIC CHECKS
Controls effected on ……………………..By……………………………...………………….of the Company ……………………………………………….
Notes / interventions recommended to the owner
* Refer to the local actuation regulations; in short and as an indication only the regulation prescribes that which follows.
Companies and technicians that carry out installation, maintenance/repairs, leak control and recovery interventions must be CERTIFIED as prescribed by
the local regulations.
The leak control must be carried out annually.
√
interval check (months)
1 6 12
□
Presence of corrosions
□
Panel fixing
□
Fan fixing
□
Battery cleaning
□
Drain pain cl sanification
□
condensate discharge test
□
Air filter cleaning
□
Check of the fixing and the insulation of the power lead
□
earthing connection check
□
Electric panel cleaning
□
Capacity contactor status,
□
terminal closing, cable insulation integrity
□
Voltage and phase unbalancing (no load and on-load)
□
Absorptions of the single electrical loads
□
Test of the compressor carter resistances
□
Leak control *
□
Work parameters of the refrigerant circuit
□
4-ways valve check
□
Protective device test : safety valves, pressure switches, thermostats, flow switches etc
□
Control system test: setpoint, climatic compensations, capacity stepping, water / air flow-rate variations etc
□
Control device test : alarm signalling, thermometers, probes, pressure gauges etc
□
Flow switch / differential pressure switch function
□
Water flow-rate
□
Water filter cleaning
□
Air in the pipes
□
Charged pressure of water system
9 - MAINTENANCE
Содержание DFO 5 - 9 - 17
Страница 17: ...6 ELECTRICAL CONNECTIONS 6 3 ELECTRIC PANEL SIZES 5 9 ELECTRIC PANEL SIZES 17 X1 X1 A B A B C2...
Страница 24: ...6 ELECTRICAL CONNECTIONS...
Страница 43: ...NOTES...
Страница 44: ...NOTES...