Chapter 4
l
RN commissioning
Establishing the CLI/SSH/Ethernet connection
Airvana ipBTS C30 Installation and Commissioning, Release 4.0
4-21
Procedure
1. Enter the following commands to set the IP address on the Ethernet port of the active
ADCC:
ipBts-XXX>
enable
ipBts-XXX#
configure
ipBts-XXX(config)#
interface ethernet1/0/1
ipBts-XXX(config-if)#
ip address 10.0.0.1/24
ipBts-XXX(config-if)#
no shutdown
ipBts-XXX(config-if)#
exit
ipBts-XXX(config)#
exit
ipBts-XXX#
exit
NOTE:
Ethernet1/0/1 identifies the Ethernet interface on the ADCC in slot 1 as follows:
The “1” indicates
this node.
The “0” indicates
slot 0, (a virtual slot)
. The final “1”
indicates the
Ethernet port number
. This IP address and mask and the IP address and mask
configured in the next step form a subnet. You can use any two IP addresses that are in the
same subnet.
2. Enter the following IP configuration into the Ethernet network interface card (NIC) on
your laptop:
•
IP address:
10.0.0.2
•
Subnet mask:
255.255.255.0
•
Default gateway: no default gateway is required — leave it blank.
3. Verify the connection information using the
show int
command:
ipBts-XXX>
enable
ipBts-XXX#
show int
Name Connection IP Address In Octets Out Octets Admin Oper
----------------------------------------------------------------------
ethernet1/0/1
10.40.192.222/16
169137221
7312611
Up Up
mgmt1/0/1 0.0.0.0/0
0
0
Down Down
node1/0/1 10.6.190.222/32
0
0
Up Up
NOTE:
Airvana does not specify the laptop operating system and cannot specify the exact
steps you need to take to configure the IP information for the Ethernet NIC.
This procedure is complete. Go to
Establishing the CLI/SSH/Ethernet connection
Establishing the CLI/SSH/Ethernet connection
This procedure explains how to physically connect the laptop to the node through the Ethernet
Содержание ipBTS C30
Страница 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Страница 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Страница 19: ...About this document Notes cautions and warnings Airvana ipBTS C30 Installation and Commissioning Release 4 0 6 ...
Страница 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Страница 26: ...Chapter 1 l ipBTS system overview Replaceable RN modules 1 6 910136 Rev01 00 Standard July 2007 ...
Страница 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Страница 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Страница 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Страница 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Страница 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Страница 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...