Air4Gp Installation Guide
Page 29
Commercial in Confidence
UGD-D00236 Rev B
4.2 Wall mount configuration
The following image shows the wall mount assembly.
Figure 11 – Wall Mounted Air4Gp
To mount the Air4Gp in the wall mount configuration, perform the following steps:
1. Attach the Tilting panel to the wall at the height required to attach the Air4Gp using wall
plugs rated for at least 10 Kg.
2. Assemble the 2 interface brackets (left and right) with their threaded pin facing outwards
(in the up position) to the threaded holes on the rear side of the Air4Gp.
3. Attach the GPS on to the GPS antenna bracket and attach to the top of the Air4Gp.
4. Fasten the surge protector into the provided hole (in the Tilting panel) and hand-tighten.
5. Carefully align and position the Air4Gp unit so that the threaded pins (1 on each the
Interface bracket) fit into the notched grooves provided on the Tilting panel and hand
tighten. Insert the M8 screws, washers and nuts (supplied) and fasten to the Tilting panel.
Caution: This unit weighs 10 kg take care when lifting.
6. Adjust the unit to the desired angle.
7. Check and tighten all fixing screws.
4.3 Air4Gp Connections
The following diagram displays the connections on the bottom side of the Air4Gp.
The base station requires a secure ground connection. The cable should also be grounded to the
tower which is grounded at the tower base. A grounding screw fitted with a flat washer and lock
washer is provided on the bottom of the chassis clearly marked with the universal ground symbol
as shown below.