airquee WORLD'S BIGGEST BOUNCY CASTLE Скачать руководство пользователя страница 5

 
 
 

 

Page 5 of 5 

 

 
After connecting all four parts together please connect the fans to the unit as described 
in the Operation Manual provided and start inflation. 
Anchor  the  inflatable  temporarily  to  avoid  movement  during  inflation.  Once  inflated 
reposition and anchor fully as per the Land Operation Manual guidelines.   
There  are  two  entrances  (fig.1)  and  two  emergency  exist  (fig.2)  on  the  unit 

–  see 

pictures: 

fig.1 

fig.2 

At the two entrance doors there is a step cover which needs to be velcroed in place 

– 

see images: 

 

 

Recommended daily checks: 
- Please see page 14 on the Operation Manual  
- Please also check the carabiners connections daily 

– or if the unit is in use for 

several hours a day please take some short breaks for safety checks 

Содержание WORLD'S BIGGEST BOUNCY CASTLE

Страница 1: ...ant that this is carried out to avoid ground anchors penetrating underground services and the unit coming into contact with overhead cables when inflated 2 You should provide an adequate power supply to the fans this should adhere to your local power regulations Look at the information label on the blower to see how much power it uses 3 Important We recommend to have a generator on site in case of...

Страница 2: ...mergency plans 4 Separate users into groups of approximately the same height this is avoid the more boisterous users coming into contact with the smaller users 5 It is imperative for the unit to be positioned in a place where there is enough free space above it in order to avoid contact with any cables branches etc 6 Make sure that the unit is positioned in a place where there is enough space arou...

Страница 3: ... can start connecting the unit by first attaching only two parts by connecting their small anchors on to each other using the carabiners provided Then you can continue with other parts until you connect all four parts see images ...

Страница 4: ...four parts are connected with the carabiners please continue connecting the unit with the sandwich Velcro After the bed is velcroed the walls also need to be connected with Velcro before inflation see image Wall of the unit ...

Страница 5: ...r fully as per the Land Operation Manual guidelines There are two entrances fig 1 and two emergency exist fig 2 on the unit see pictures fig 1 fig 2 At the two entrance doors there is a step cover which needs to be velcroed in place see images Recommended daily checks Please see page 14 on the Operation Manual Please also check the carabiners connections daily or if the unit is in use for several ...

Отзывы: