airquee WORLD'S BIGGEST BOUNCY CASTLE Скачать руководство пользователя страница 1

 

 

Page 1 of 5 

WORLD’S BIGGEST  BOUNCY CASTLE 

**  The  following  instructions  are  on  addition  to  the  main  operation  manual  supplied 
which should be read before the installation and setup of this unit** 

 

IMPORTANT

 

AS THE OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT 
YOUR OWN RISK ASSESSMENTS BEFORE ATTEMPTING TO USE THIS PRODUCT. 

 

Site survey:  

1.  Carry  out  a  survey  of  the  area  where  the unit  will  be  located,  and  check for  any 
overhead/underground cables or other services. It is important that this is carried out 
to avoid ground anchors penetrating underground services, and the unit coming into 
contact with overhead cables when inflated.  
2. You should provide an adequate power supply to the fans, this should adhere to 
your local power regulations. Look at the information label on the blower to see how 
much power it uses. 
3.

 Important:

 We recommend to have a generator on site in case of power failure due 

to the high number of users allowed onto the unit. Or at least one fan to be powered 
from a generator on each part of the unit in case of power failure. 
4. Due to the size of this inflatable continuous checks should be carried out to ensure 
the safety of users at all times.  

 

 
 
 

Содержание WORLD'S BIGGEST BOUNCY CASTLE

Страница 1: ...ant that this is carried out to avoid ground anchors penetrating underground services and the unit coming into contact with overhead cables when inflated 2 You should provide an adequate power supply to the fans this should adhere to your local power regulations Look at the information label on the blower to see how much power it uses 3 Important We recommend to have a generator on site in case of...

Страница 2: ...mergency plans 4 Separate users into groups of approximately the same height this is avoid the more boisterous users coming into contact with the smaller users 5 It is imperative for the unit to be positioned in a place where there is enough free space above it in order to avoid contact with any cables branches etc 6 Make sure that the unit is positioned in a place where there is enough space arou...

Страница 3: ... can start connecting the unit by first attaching only two parts by connecting their small anchors on to each other using the carabiners provided Then you can continue with other parts until you connect all four parts see images ...

Страница 4: ...four parts are connected with the carabiners please continue connecting the unit with the sandwich Velcro After the bed is velcroed the walls also need to be connected with Velcro before inflation see image Wall of the unit ...

Страница 5: ...r fully as per the Land Operation Manual guidelines There are two entrances fig 1 and two emergency exist fig 2 on the unit see pictures fig 1 fig 2 At the two entrance doors there is a step cover which needs to be velcroed in place see images Recommended daily checks Please see page 14 on the Operation Manual Please also check the carabiners connections daily or if the unit is in use for several ...

Отзывы: