Page
11
of
14
7.4.3 Positioning of the Control Panel:
The control panel must be placed at the entrance, at an approximate distance of 1.5M, so that
the operator has an unobstructed view of ALL the players.
8. Routine Inspections, Trial Operations and Thorough Examinations:
8.1 Routine inspections (before every use)
After every setup or operation, before opening the game to the public, the controller or his
nominee
SHALL PERSONALLY CHECK
that the setup of the Last One Standing is correct.
We recommend to check for every criteria written below. The person carrying out the check shall
be sufficiently trained or experienced in the check routines that have to be carried out.
Check that:
- every button is in a working condition on the Control Panel.
- the electrical connection sockets and cables are not chafed nor damaged.
- the Velcro of every cover has a good grip and is not weakened, the covers are
not damaged and no accessible parts of the machinery has sharp edges,
sharp angles or rough surfaces to cause injury, and no openings which can
“trap” parts of the body or clothing.
- the webbing cam buckles of each sealed arm are not damaged, including their
stitching to the sealed arms cover.
- the stitching of the bed and walls do not have tear, rips which could represent
a safety hazard.
- the metal arms and springs
don’t have any sign of damage.
- all nuts and bolts are secure and tightened.
- the inflatable bed is securely anchored.
OPERATOR/CONTROLLER
ENTRANCE
FIELD OF VIEW