airodoctor.com
4
AiroDoctor
In-duct air purifier system V10P-ID
Installation / Assembly
Assembly instruction
The proper installation placement of the
device is after the filters of the ventilation/
air conditioning (HVAC) unit.
The connections are designed according
to DIN 24147 in „nipple dimension“, i.e. the
connections fit into the existing spiral ducts.
The line connections must be made airtight.
k
Assembly can be carried out in any
orientation.
k
The flow direction is marked on the
device.
k
The ControlBox 10P must be accessible
and serviceable, not covered or
obstructed by other objects, walls, or
ceiling.
k
In the vicinity of heating elements,
observe ambient temperatures (<50°C).
Pressure loss, power reduction
The resulting pressure drop is 40 Pa.
Assembly and electrical work
The connection to the power line must be
carried out by trained personnel, following
local regulations, using the RST 16/3 device
and the supplied cable.
Preferably, connect the unit to the power
supply of the HVAC system to switch the
unit ON and OFF simultaneously with the
existing system.
The green LED will confirm the correct
connection of the device, now in standby
mode, ready to use.
To reduce operating costs and extend
product life, the device will activate the air
purification process automatically and only
when the internal sensor detects an air flow
(differential air pressure sensor > 20 Pa).