POSITIONING
The compressor is to be placed in a room
which is easy to air, so that dust, sawdust,
gasses or explosive substances do not enter
the air outlet openings, and should moreover
be far from heat releasing devices.
CONNECTION TO THE ELECTRIC
INSTALLATION
Make sure that the voltage of the plug
corresponds to that written on the label and
that the compressor is put to earth in
compliance with the provisions of the
President’s Decree 548.
Connect the electric compressor with the
supplied cable and do not use inadequate
extensions. These might compromise the
correct functioning of the compressor. Do not
carry out precarious repairs on the cable, or
cut it, and avoid it from being damaged. If the
cable shows signs of wearing out, has to be
replaced with one of the same type.
SETTING IN MOTION
Before putting the compressor into
operation a few preliminary checks are to
be carried out (please read carefully the
following instructions):
n
remove the plastic tap from the carter
cover and insert the oil measure spindle
or the oil outflo/inflow tap.
(fig. 1-2)
;
n
remove the plastic tap from the
compressor head and replace it with the
supplied air suction filter
(fig. 1-2)
;
n
if working with a lubricated compressor
check the oil level with the oil measure
spindle (if the level differs from normal,
read the instructions under the title
“Maintenance interventions”). The oil level
has to be within the MIN. and the MAX.
marks of the spindle
(fig. 3-3.1)
;
n
check the condensation outflow tap
(fig.
4)
;
n
make sure that the button on the air
pressure switch is the “OFF-0” position.
SETTING IN MOTION - SWITCHING OFF
15
GB
fig. 1
fig. 2
fig. 3
LEVEL
MIN-MAX
WARNING! Replace oil
after the first 50 hours of operation
Содержание CH25/210 PL
Страница 1: ...6 0 50 65 0 3FW...