background image

10

55

56

Now repeat the same exercise for positions 5 through 8. Once completed attach the remainder of the 
SPRINGS in the manner already described and use the SPRING ATTACHMENT TOOL as required.  As 
a reminder make sure the each D-RING is correctly positioned with the long edge fitted flush in its 
respective fabric sleeve. 

Your net should now be evenly attached to the JUMPING MAT as shown above.

TOP VIEW 

OF THE TRAMPOLINE 

1

2

3

7

8

6

5

4

JUMP MAT

Feed Dring through net

and attach spring.

Содержание Aero bounce 120

Страница 1: ...Assembly and Operating Manual The content in this document is subject to change without notice Copyright MacTrends International Ltd 2013 All rights reserved...

Страница 2: ...activity which could result in injury By purchasing this product and or using it you are agreeing to take full responsibility for your own actions and those who use it Please insure that the trampoli...

Страница 3: ...a careful and thoughtful manner As an example do not let tools lie around the workspace that could be tripped over or stood on Dispose or place in storage packaging material in a way that cannot cause...

Страница 4: ...people must be evenly spaced around the frame to lift it off the ground The trampoline must be carried horizontally If the frame is bent during this process it must be corrected before reuse If used...

Страница 5: ...ffing the fibreglass poles for breakages and or disconnections and the springs for breakages All faulty components must be replaced before the trampoline is fit for use again Also any sharp edges e g...

Страница 6: ...1 3 5 2 3 16 15 10 9 8 6 Airmaster Trampoline Parts list 4 7 17 14 18 21 20 19 22 23 11 13 24 25 12...

Страница 7: ...8 1 5 2107mm P OTP04A1 08 LE P OTP04A1 10 LE P OTP04A1 12 LE P OTP04A1 14 LE 38 1 5 335mm 38 1 5 445mm 38 1 5 530mm 38 1 5 530mm P OTP04A1 BH LP P OTP04A1 BH LP 38 1 5 733mm 38 1 5 733mm P OTP04A1 BH...

Страница 8: ...830 70 mm P OTP04A1 AK P OTP04A1 AK P OTP04A1 AK P OTP04A1 AK 8 430mm 8 430mm 8 430mm 8 430mm P OTP04A1 08 TB P1 P OTP04A1 10 TB P1 210 100mm 210 100mm 23 Basketball assembly tool bag P OTP04A1 TB P2...

Страница 9: ...4 FR 9 4963mm 7 joints 9 5873mm 8 joints P OTP04A1 PS SM P OTP04A1 PS SM 1920mm 1920mm P OTP04A1 UP P OTP04A1 UP 25 1 2 935mm 25 1 2 935mm P OTP04A1 MP P OTP04A1 MP 25 1 2 935mm 25 1 2 935mm P OTP04A1...

Страница 10: ...1 SW M6 35 7 Nuts P OTP04A1 NT 15 P OTP04A1 NT 21 P OTP04A1 NT 21 P OTP04A1 NT 21 M6 plastic caps P OTP04A1 PC M6 12 P OTP04A1 PC M6 16 P OTP04A1 PC M6 16 P OTP04A1 PC M6 16 Spacer P OTP04A1 SC 10 P O...

Страница 11: ...6 35 1 P OTP04A1 SW M6 35 1 P OTP04A1 SW M6 35 1 P OTP04A1 SW M6 35 1 Parts name Parts Code Qty Parts name Qty picture Basketball board P OTP04A1 BP BB 1 Net bag 1 Hoop P OTP04A1 BP HP 1 Metal plate 1...

Страница 12: ...ist for quantity of parts you are assembling as they can vary from model to model 7 8 Connect the two LEGS to each FOOT as shown 5 6 Locate the parts as shown Select a two LEGS and a FOOT Note Please...

Страница 13: ...15 16 Take two assembled TOP RAIL FOOT and LEG units turnover and connect together The connected pairs should stand up unsupported Continue connecting the rest of the sections together Note Please re...

Страница 14: ...ot be completely connected This is perfectly fine because once the springs are added this will pull the frame securely together 3 20 21 Lay out the JUMPING MAT on the ground inside the completed frame...

Страница 15: ...ing effort needs to be applied to fit each spring As required use the Spring Attachment Hook to accomplish this task 24 25 Next connect MAT to the FRAME at the quarter sections the points half way bet...

Страница 16: ...le does not have this plastic cap 30 31 Take a SLEEVE Slide the open end over the top of the curved pole plastic cap pull all the way down to the bottom making sure that it is not bunched at the top 2...

Страница 17: ...basketball hoop frame onto the thickest biggest netting pole as above shown 38 Assemble the two FIBREGLASS RODS using the galvanised connectors as shown above In the process be careful not to over st...

Страница 18: ...them forward toward the centre of the net until they are at a matching angle and are able to be connected 42 To make the second connection and therefore form a loop have one person stand on the join m...

Страница 19: ...be hanging mid way between two safety poles Take a hold of the Zip and following it down select the metal D RING attached to the JUMPING MAT that is positioned to the bottom right of the Zip Slide the...

Страница 20: ...a SPRING connecting the JUMPING MAT and FRAME in the same manner as before 53 54 Move to positions 3 and 4 repeating the process TOP VIEW OF THE TRAMPOLINE 1 2 3 7 8 6 5 4 JUMP MAT ZIP ENTRANCE Note...

Страница 21: ...ed and use the SPRING ATTACHMENT TOOL as required As a reminder make sure the each D RING is correctly positioned with the long edge fitted flush in its respective fabric sleeve Your net should now be...

Страница 22: ...x 1 HOOP ding bolts the e der metal p on the front p ball hoop on bolt M575mm SET AS e M812mm x plate and sc plate nto the hoo m x 1 in wit SSEMBL x 2 on the ba crew the bol op th 4 Plac plat LY ack...

Страница 23: ...ew t plate 7 You nea the bolt M arly finish 8100mm into the met tal 6 Put scre 8 Plac Finis the other s ew the nut M ce the netting shed pring onto t 8 in g and Velcro the bolt M8 it onto the h 8 and...

Страница 24: ...11 YOU ARE NOW FINISHED ENJOY THE MEGA BOUNCE 140 14ft THE AERO BOUNCE 120 12ft THE SUPA BOUNCE 100 10ft THE BOUNCE 80 8ft...

Отзывы: