4. Operation
2. Operating procedure
CDStart the generator unit under the procedure of manual operation and adjust the frequency
and voltage.
®Turn the starter switch to "STOP" position and stop the engine.
@Turn the circuit breaker of output terminal "ON'' after the generator unit stopped when you use
the circuit breaker and single phase receptacle on the control panel.
@Turn the operating selector switch to "AUTO" position on the control panel.
@The unit will be under stand by and start once the start signal is sensed.
3. Function
When start signal activates in stand-by conditions, it starts the generator engine after preheating.
When stop signal activates, it continues 5 seconds cooling down operation to stop engine and the
machine is placed again in stand-by conditions.
Vo
l
ta ge
Time
Starting
confirmed Preheating
2seconds 2seconds
5seconds
cti
"O
Cf)
"O 'O
"O
C:
C:
t
(])
(])
(])
cti cti
0.
>,
C1J
C1J
(])
...
E
0
.Cl
Cl
E
.....
0. :::,
C:
C:
·u5
Cf)
Cf)
...
en
Olm
Cl Cl
"O
E
(])
Cf)
c:-8
·u5 ·u5
C:
t
0
C:
.!::S:
C1J
.Q:1::
C1J
C1J
(.)
·a
t,Q
(])
t5 :::l
0.
0.
en
en
Ol
0
0
t
C:
(])
(])e
en en
.....
Jg
C1J
w
(])
c5·c3
en
0
�
4. Starting action
Even when the engine will not start even after cranking operation for 10 seconds, stop it 8 seconds
and then try cranking operation again. In case the engine will not start even after cranking
operation is repeated three times, trouble signal goes on showing difficulty in starting.
Start signa
l
ON
12 seconds
>1 1<
!Power supp
l
y I �=::1::
=
1 =,
=
1:::
"""
:::::
""
::I
""'
::::1:
=
:m1
=
1:m1
':':::::+::::::. '''''"'""'""Hl'!Hi!,:;;E:
I
,,::::
2 second5:>j
k
2 seconds>:
L
2 seconds:::,J :.__
�I C_e_
ll
_ m_o_t_o�rl
Preheating !':'::': ::::::':::::::::::::::::;::::::;f reheating ,,i:i'iiF idi::m::1:m::::::::f reheating
,
=1::
=
,,{-:{=I
=
:::::
=
:::::
=
::::
=
:::::
=
:::\.�I ---
Indication of
ma
l
fun ctions
1<10 seconds>!< 8 seconds>!< 10 seconds>!< 8 seconds
.>
k10 seconds
:::,
:
__
.,.,.....,.,
[IMPORTANT] -
Perform periodical inspection and maintenance of the generator
-
• For maintenance of the generator, try operation 5 to 1 O minutes once a week.