AirJet 2100 ALL-FUEL CHIMNEY Скачать руководство пользователя страница 2

READ ALL OF THESE INSTRUCTIONS CAREFULLY AND FOLLOW THEM EXACTLY !

  These instructions are for model 6S and 8S chimneys used for 1,000° F for continuous burn and up to
1,400° F for periods up to one hour and 2,100° F for periods up to 10 minutes.
  This chimney is suitable for use with appliances burning gas, oil, coal (

NOTE:

 Certain types of coal

have a high sulfur content, which causes corrosion of stainless steel. Therefore this type of coal is not
recommended for use with factory built chimneys.) or wood such as cooking ranges, heating or fire-
place stoves, central furnaces, floor furnaces, hot water and steam heating boilers, recessed or unit
heaters, water heaters, domestic type incinerators, bakery ovens, and for industrial type low heat
appliances (NFPA - Table 9 - IP). (These chimneys shall be installed in accordance with local building
codes or as recommended by NFPA No. 211 and 54.) Chimneys installed without the use of the starter
section (6SS, 8SS) are listed to UL 103 (1,700° only), and may be connected to residential and building
heating appliances which are gas or oil fired ONLY, as specified in Note 3 to Table 1-2(a) of NFPA 211.

CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND
INSTALLATION INSPECTIONS IN YOUR AREA

.

  The chimneys can be installed in single or multi-story buildings with maximum permissible overall
height from support to top of housing of 50’.
  

A minimum clearance of 2 inches of air space to combustible materials

, building insulation,

enclosure walls, and roof must be maintained. Do not place any insulation material in clearance spaces
around pipe. Clearances at floor joists, and ceilings are established by the installation of the factory
furnished base supports and firestop shields and may be less than 2”. The flue gas exits must be a
minimum of 3’ above the roof and not less than 2’ above any projection within 10’.

A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS
FAILURE TO MAINTAIN REQUIRED CLEARANCE (AIR
SPACES) TO COMBUSTIBLE MATERIALS, IT IS OF THE
UTMOST IMPORTANCE THAT THIS CHIMNEY BE
INSTALLED ONLY IN ACCORDANCE WITH THESE
INSTRUCTIONS.

CKS

OTK

RSK

HL

Ceiling and Roof

Through-the Wall

“A” Frame

Decorative Housing

Order: CHASE KIT

& HTK KIT

Order: OUTSIDE

WALL KIT

Order: ROOF

SUPPORT KIT

Order: CHIMNEY

HOUSING KIT & HTK

KIT

18” Stainless Steel

Telescoping Section

Boot Flashing

Top Cap

4 Panels

Attic Insulation

Shield (Contained in

HTK Kit)

Starter Section

(Contained in

HTK Kit)

Roof Support

Starter Section

Boot Flashing (High pitch

available on order)

Storm Collar

Round

Termination

Cap

Round

Termination

Cap

3 Wall Bands

Weather Shield

Adjustable Snout Tee

Tee Support

Face Plate

Matte Black

Adjustable Wall

Thimble Matte Black

Round

Termination

Cap

Storm Collar

Boot Flashing

0/12 to 6/12

Pitch

Starter Section

(Contained in HTK

Kit)

Ceiling Cover Base

Support Matte Black

Attic Insulation

Shield (Contained

in HTK Kit)

Ceiling Cover Base

Support Matte

Black

At least 2 ft

When

10ft or

Less

Minimum

3 ft

Содержание 2100 ALL-FUEL CHIMNEY

Страница 1: ...meet new criteria for wood burning applications exclusive snap lock design for fast easy installation heavy duty interior liner Tools You Will Need Power Saber Saw Hammer and Nails Screwdriver Plumb Bob Caulking Gun Tin Snips SUPPLIES 10d nails 8d nails 6d nails silicone caulk or roof tar 10 screws plumbers tape Please read Instruction Notes inside before starting AirJet Inc 3020 Mine Road Frederi...

Страница 2: ...ng of 50 A minimum clearance of 2 inches of air space to combustible materials building insulation enclosure walls and roof must be maintained Do not place any insulation material in clearance spaces around pipe Clearances at floor joists and ceilings are established by the installation of the factory furnished base supports and firestop shields and may be less than 2 The flue gas exits must be a ...

Страница 3: ... is located is to be provided with an enclosure having a fire resistance rating equal to or greater than that of the floor or roof assemblies through which it passes The following installation applications take into account the various building constructions single floor two floor and multi floor INSTALLATION OF 6S OR 8S CHIMNEY 1 Through the Ceiling Installation Cut and frame a square opening in ...

Страница 4: ...r pipe and push down until it contacts top of the insulation shield Make sure there is no gap between collar and shield Tighten the stove bolt and nut which draws the collar tight around the pipe Continue installation as required see Step 2 Figure 5 Figure 5A Figure 5C Figure 5B Multi Story Installation Single Story Installation Chimney Housing Top Assembly Telescoping Connector Chimney Housing Co...

Страница 5: ...push down until it rests on top of insulation shield Make sure there is no gap between collar and shield Tighten the stove bolt and nut which draws the collar tight around the pipe Continue installation as required see Step 2 STEP 2 Locate the center point where the chimney will pass through the roof by using a plumb bob Cut an opening large enough to provide a minimum of 2 clearance all around th...

Страница 6: ...h against the wall and mark through the screw holes onto the wall see Figure 10 Remove the tee from the support and screw the support to the wall at the marked location with nine 9 10 screws Place the tee female end down while sliding the snout through the thimble making sure to maintain required clearance to combustibles Tee snout must protrude through the wall a minimum of 1 Snout is adjustable ...

Страница 7: ...oof peak or building projection then it must terminate at least 2 above such peak or projection height see Figure 1 8 Place termination cap 6SU 8SU down until it is firmly in place Tighten the screws on collar until cap is fastened securely on the top pipe section 9 Install weather shield 6SWSH 8SWSH Using screws provided place two halves of weather shield around the tee to cover the outside wall ...

Страница 8: ...below the first elbow a second wall band should be installed around the vertical return elbow Second wall band will require framing out from wall for attachment Remember to maintain the 2 clearance to combustible requirement Terminate as described in Step 8 If the overhang is too wide for offsetting finish the chimney as you would with a ceiling installation Remember to maintain the 2 clearance to...

Страница 9: ... see Figure 14 3 Place starter pipe section into roof support 6SRS 8SRS with female end down over centering flange Install section of pipe onto starter section by aligning the seams and pressing straight down until a click is heard Slide boot flashing 6SBF 8SBF over pipe into place over roof opening Lay bead of caulk under edge of flashing Check to see that chimney is vertical and attach flashing ...

Страница 10: ... Seal the plastic bag around the opening with tape so no debris will escape Clean tee snout in the same manner as the top cap and smoke pipe sections were cleaned Shove debris toward tee support outside so it will be collected in the plastic bag Then attach a plastic bag around the tee snout in the same manner as on the tee support NOTE If deposits are very heavy or you are unable to clean the chi...

Отзывы: