Airflow Vector Pty Ltd
4 Collins Rd, DROMANA VIC. 3936
AUSTRALIA
Ph: +61 3 5987 3733
www.airflowvector.com
SD009US (S009 Instructions booklet).doc
21 March 2011
Page 13 of 16
3.77 Secure the air box
3.78 Re-install the battery
3.79 Re-secure the coolant bottle
3.80 Slide the hose clamp SP157
on the air ram SP187 then
slide it on the snorkel SP185
3.81 Ensure that the top of the
snorkel matches the top of
the slot cut in the Air Ram
3.82 Drill the hose clamp next to
the worm drive
3.83 Secure the Air Ram with the
self tapping screw SP029