background image

Condensing Units 

CUS 15 - 60 / HCU 20 

²

 30D

 

 

 

Chillers & Condensing Units 

 

Installation & Maintenance:Part No: 6259592 IM 07/14 

15

 

Refrigeration System 

HOLDING CHARGE 

All units are shipped with a holding charge of dry nitrogen. This is to ensure that there 
is no risk of internal contamination or moisture entering the units during shipping or 
storage. 

 

Before the units are evacuated prior to the charging process, the condensing unit 
should be checked to see that the holding charge has been retained. If it appears to 
be either partially or totally lost, then the unit concerned should be carefully checked 
for signs of physical damage. 

PIPEWORK SIZING/OIL 
ADDITION. 

It is 

MOST IMPORTANT 

that the correct size refrigeration pipework is used to ensure 

that the pressure drop in the system is kept to a minimum, and also so that proper oil 
return will take place under all normal operating conditions. 

 

Accepted Good Practice should be followed in the design and installation of the 
refrigeration pipework system. 

 

Oil should be added to the pipework installation in accordance with the compressor 
manufacturers recommendations where applicable. 

PRESSURE TESTING 

When installation is complete, fill the system with dry nitrogen to a pressure of 17 
bar/250 psig.  Record the pressure over a period of time (a minimum period of 60 
minutes should be sufficient to detect any major leaks, however, ideally 24 hours 
should be allowed).  If there is any reduction in pressure, trace the leak and repair 
before conducting a further pressure test. 

EVACUATION 

Evacuation should be carried out with a high vacuum pump.  The pump should be 
connected to the high and low pressure sides of the system via a gauge manifold 
fitted with compound gauges.  A high vacuum gauge should be fitted to the system at 
the furthest point from the vacuum pump. 

 

Triple evacuation should be used to ensure that all contaminants are removed or at 
least reduced to significantly low proportions. 

 

There are no hard and fast rules when applying this method.  However, the following 
has proved effective for general installation and service work. 

1.  Recover system charge and pressure test. 
2.  Replace filter drier. 
3.  Evacuate to (10 Torr) 13 mBar and maintain for 20 minutes. 
4.  Break vacuum with OXYGEN FREE dry nitrogen to 0.5 Bar (7psi) and hold for 15 

minutes. 

5.  Evacuate to (5 Torr) 7mBar and maintain for 20 minutes. 
6.  Break vacuum with OXYGEN FREE dry nitrogen to 0.5 Bar (7psi) and hold for 15 

minutes. 

7.  Evacuate to (½ Torr) 0.65 mBar and maintain for 1 hour. 
The plant should now be sufficiently dehydrated and suitable for recharging. 

 

Note: During installation keep all pipes capped to prevent dirt and moisture 
ingress.  If polyolester oil becomes contaminated with moisture then it is 
advisable to change the oil and filter drier. 

ALTERNATIVE 
REFRIGERANTS 

There are now an increasing number of transitional refrigerants as well as the 
traditional ones and if any refrigerant other than R 22 is used care must be taken in all 
aspects of installation and charging. 

 

This is especially important with regard to the type of compressor oil used, and care must 
be taken to ensure that the correct oil is used with the correct refrigerant. 

 

IMPORTANT:- If an alternative refrigerant is used, then this must be with the 
approval of Airedale International Air Conditioning Ltd. Use of an alternative 
refrigerant without the approval of AIAC Ltd could invalidate the warranty. 

Содержание CUS Series

Страница 1: ...i n s t a l l a t i o n m a i n t e n a n c e C O N D E N S I N G U N I T S C U S 1 5 6 0 H C U 2 0 3 0 D ...

Страница 2: ...3 238 7789 uk sales airedale com International Enquiries 44 0 113 239 1000 enquiries airedale com Spares Hot Line 44 0 113 238 7878 spares airedale com Airedale Service 44 0 113 239 1000 service airedale com Technical Support 44 0 113 239 1000 tech support airedale com Training Enquiries 44 0 113 239 1000 marketing airedale com For information visit us at our Web Site www airedale com AIAC Ltd end...

Страница 3: ...10 Dimensions Page 11 Refrigeration System Refrigeration Pipework Schematics Page 14 System Holding Charge Page 15 Pipework Sizing Oil Addition Page 15 Pressure Testing Page 15 Evacuation Page 15 Refrigerants Page 15 Electrical Information Electrical information Control panel components Page 16 Electrical Data Sheet Page 17 Terminal Blocks External Connections Page 18 Commissioning Procedures Comm...

Страница 4: ...aeder access connector to facilitate connection of a service gauge manifold The suction line connection is capped and sealed ready for customer connection A large capacity filter drier is supplied loose for on site installation A manual high pressure and automatic low pressure cut out switch is fitted on each circuit for system safety All units are configured to operate without pump down CONTROL P...

Страница 5: ...tandards and codes of practice 5 Refrigerant No 22 and 407C used in this range of products is classified under the COSHH regulations as an irritant with set Occupational Exposure Levels OEL for consideration if this plant is installed in confined or poorly ventilated areas 6 A full hazard data sheet in accordance with COSHH regulations is available should this be required SPARES A recommended spar...

Страница 6: ...aluation Parts fitted under warranty shall be warranted for the unexpired period of warranty of the equipment or 3 months from delivery whichever period is the longer This excludes compressors on which a further 12 months warranty is granted PROCEDURE When a component part fails a replacement part should be obtained through our Spares department If the part is considered to be under warranty the f...

Страница 7: ...nnecessary delays incurred in return of defective component RETURNS ANALYSIS All faulty components returned under warranty are analysed on a monthly basis as a means of verifying component and product reliability as well as supplier performance It is important that all component failures are reported correctly Loose Items List FILTER DRIER A suitably sized liquid line filter drier is shipped loose...

Страница 8: ... It carries all the necessary breakers contactors and terminals required to operate the unit CUS 40 60D This is mounted in the enclosed end of the unit It carries all the necessary breakers contactors and terminals required to operate the unit CONDENSER FAN AND MOTOR UNITS These are integral fan motor units and are mounted so as to give a vertical discharge of air from the condensing units COMPRES...

Страница 9: ...shall be used to ensure that any slings or chains used in the lifting process do not crush the framework of the unit or damage the coil faces Due note shall also be made of the fact that the compressor is at one end of the unit and therefore the centre of gravity will also be towards that end If the unit is dropped it shall immediately be checked for damage POSITIONING AND LEVELLING The condensing...

Страница 10: ... 1 1 8 1 3 8 1 5 8 2 1 8 2 1 8 Machine Weight Kg 440 540 550 695 978 1119 1356 Notes 1 Based on 5 C evaporating and a 30 C ambient 2 Refrigeration charge is for information purposes only The units do not leave the factory charged 3 All terminations are suitable for sweat connections HCU 20 30D HCU 20D 25D 30D Nominal Capacity kW 58 6 69 5 81 0 Nominal Airflow m sec 6 80 6 80 6 80 Max Fan Speed rpm...

Страница 11: ...00 200 1250 1250 25 1050 CUS 25D mm 1438 2900 1100 200 1250 1250 25 1050 CUS 30D mm 1438 3000 1100 200 1300 1300 25 1050 Point Loadings kg Centre of Gravity mm A1 B1 C1 D1 E1 F1 Y Z CUS 15D 146 101 101 156 1330 560 CUS 20D 130 120 56 56 121 140 1770 560 CUS 25D 130 122 57 57 123 141 1765 560 CUS 30D 174 140 78 77 138 179 1785 550 Notes 1 Suction and liquid connections terminate underneath the cond...

Страница 12: ... ISOLATOR ACCESS TO COMPRESSOR AIRFLOW A B C D E F G H J K CUS 40D mm 1693 2440 1800 200 1020 75 1650 155 595 100 CUS 50D mm 1693 2440 1800 200 1020 75 1650 155 595 100 CUS 60D mm 1693 2440 1800 200 1020 75 1650 155 595 100 Point Loadings kg Centre of Gravity mm A1 B1 C1 D1 E1 F1 Y Z CUS 40D 148 174 174 174 174 149 1169 896 CUS 50D 157 206 206 208 206 156 1136 900 CUS 60D 180 254 254 258 255 180 1...

Страница 13: ...G 20D mm 1993 2280 805 30 2370 150 505 25D mm 1993 2280 805 30 2370 150 505 30D mm 1993 2280 805 30 2370 150 505 Point Loadings kg Centre of Gravity mm HCU A1 B1 C1 D1 Y Z 20D 140 157 139 131 1088 391 25D 140 157 139 131 1088 390 30D 186 2 206 7 155 7 151 4 1098 372 1 Suction and liquid connections terminate on the opposite side of the unit to the condenser coil face 2 Allow 1000mm clearance on th...

Страница 14: ... Refrigeration System REFRIGERATION PIPEWORK SCHEMATICS COIL SHUT OFF VALVE CONDENSING UNIT COMPRESSOR SOLDER CONNECTIONS LIQUID STUB PIPE SUCTION IN LINE PRESSURE SWITCHES P P Notes 1 Compressor connections are diagrammatic only not actual 2 For clarity only one circuit is shown although all units are twin circuit ...

Страница 15: ...hould be connected to the high and low pressure sides of the system via a gauge manifold fitted with compound gauges A high vacuum gauge should be fitted to the system at the furthest point from the vacuum pump Triple evacuation should be used to ensure that all contaminants are removed or at least reduced to significantly low proportions There are no hard and fast rules when applying this method ...

Страница 16: ...Relay Circuit No 2 6 R6 HP LP Trip Relay Circuit No 1 Other components are as follows some are option dependent 1 Compressor Sequence Switch 2 T1 Delay Start Timer Circuit No 1 3 T2 Delay Start Timer Circuit No 2 4 In line pressure switches HP 2 off LP 2 off 5 Electronic pressure operated condenser fan speed controller One Off CUS 40 60D 7KH IROORZLQJ 0 V DUH ILWWHG DV VWDQGDUG 1 Single phase cont...

Страница 17: ... 50 50 75 50 50 75 75 Type of Start Direct on Line Condenser Fan Motor Rating kW 0 55 0 55 0 55 0 55 0 55 0 55 0 55 Full Load A 2 50 2 50 2 50 2 50 2 50 2 50 2 50 Locked Rotor Amps A 5 80 5 80 5 80 5 80 5 80 5 80 5 80 1 Nominal Run Amps based on 5 C evaporating and a 35 C ambient 2 CUS40 60 units do not require a separate permanent fused supply HCU 20D 25D 30D Unit Data Nominal Run Amps 1 A 38 46 ...

Страница 18: ...act 527 CUS 40 60 UNITS L1 L2 L3 Î Mains Incoming N 400 3 50 E L4 Î L4 N1 Permanent Supply N1 230 1 50 500 Î 0V 502 Î 24VAC XVWRPHU V RQWURO 506 Î 502 506 Stage One Cool Customer s Control 513 Î 502 513 Stage Two Cool Customer s Control 522 Î 522 552 Stage Three Cool Customer s Control 552 523 Î 523 555 Stage Four Cool Customer s Control 555 507 Î 507 500 Liquid Line Solenoid 1 Circuit 1 Customer ...

Страница 19: ...2 mBar 2 2 Vacuum hold time Circ 1 Min Circ 2 Min 2 3 Refrigerant type 2 4 Refrigerant charge Circ 1 kg Circ 2 kg 2 5 Timer settings correct and operational if fitted Low pressure override 3mins Circ 1 Mins Circ 2 Mins Defrost 30 mins Circ 1 Mins Circ 2 Mins Anti cycle timer 10 mins Circ 1 Mins Circ 2 Mins 2 6 Head pressure control set Circ 1 Barg Circ 2 Barg 2 7 HP LP switch cut outs Circ 1 Barg ...

Страница 20: ... Bar 400 psi CUT OUT LOW PRESSURE SWITCH 0 5 Bar 7 psi CUT OUT 3 8 Bar 55 psi CUT IN REFRIGERATION CIRCUIT CHARGING Procedure The system should be charged in accordance with accepted good practice and the suction and discharge pressures should be constantly monitored whilst charging is in progress At the same time the compressor current should be monitored The system should be charged to the relev...

Страница 21: ...peed operation in one of two possible modes The head pressure is controlled by a separate head pressure controller for each refrigeration circuit The head pressure controllers are enclosed in a plastic box which contains all the necessary components including the pressure transducer Connection to the respective refrigeration circuit is via a capillary of suitable length There are Two control knobs...

Страница 22: ...r Check winding resistances replace compressor If burnt out follow burn out procedure using suction line burn out drier Noisy Compressor Lack of oil Repair leaks if any add oil if required but not too much remember too much is as bad as too little Investigate pipe system and trapping Best method to pump down to see if oil can be encouraged back If no oil still drain compressor and measure in corre...

Страница 23: ...djust replace as appropriate Lack of refrigerant bubbles in sight glass only as indication Check for leaks reclaim refrigerant repair evacuate and recharge system Clogged filter drier pressure temperature drop across it Replace once the cause has been identified and rectified Condenser fan running at full speed in winter full airflow Check fan speed controller setting if faulty replace Suction Pre...

Страница 24: ...ad pressure controller to suit Faulty pressure sensor Check electrical connections are secure at controller and pressure sensor Replace controller and sensor as they are matched sets Faulty Controller LQN ZLUHV OLQH DQG ORDG WR E SDVV controller If motor runs full speed replace unit Condenser fan runs too fast High ambient condition or excessive re circulation of air around condenser coil Check in...

Страница 25: ...and corrosion REFRIGERATION CIRCUITS 1 Check the suction and discharge pressures using a service gauge manifold and compare them with the commissioning sheet If there is any significant variation then the fault should be found and corrected Refer to the troubleshooting section 2 Check that the high and low pressure switches are cutting out the compressors at the correct settings High pressure swit...

Страница 26: ...sing a mild detergent Treat any paint damage or rust as necessary ELECTRICAL 1 Check all electrical connections for signs of overheating or arcing 2 Check all cables for signs of chafing or physical damage SERVICE CHECKS YEARLY As three monthly plus the following 1 Check all electrical connections for tightness 2 Check all refrigeration connections with leak detector ...

Страница 27: ...Condensing Units CUS 15 60 HCU 20 30D Chillers Condensing Units Installation Maintenance Part No 6259592 IM 07 14 27 Notes ...

Страница 28: ... Find Us Head Office Airedale International Air Conditioning Ltd Leeds Road Rawdon Leeds LS19 6JY United Kingdom Tel 44 0 113 239 1000 Fax 44 0 113 250 7219 e mail enquiries airedale com website www airedale com ...

Отзывы: