background image

9

PARTS LIST AND DIAGRAM

Содержание MiracleAir CM-12

Страница 1: ...rom Air Quality Engineering Inc is the ultimate solution for indoor air pollution capturing both particulate and gaseous contaminants Odors tobacco smoke pollen dust vapors and many other irritants ar...

Страница 2: ...2 TABLE OF CONTENTS PAGE SPECIFICATIONS 3 PLANNING THE INSTALLATION 3 ELECTRICAL INSTALLATION 5 ELECTRICAL SCHEMATIC 6 CHECKOUT 7 MAINTENANCE 7 PARTS LIST DIAGRAM 9 WARRANTY 10...

Страница 3: ...ersion has two modules each containing 10 disposable panels for a total carbon weight of 22 lbs PLANNING THE INSTALLATION WARNING EXPLOSION HAZARD Can cause property damage severe injury or death 1 Do...

Страница 4: ...x H of Room x Air Changes Hr of CM 12 s CFM of Air x 60 Min CHOOSE LOCATION To ensure even air distribution the CM 12 draws air into the center of the air cleaner and discharges air in four directions...

Страница 5: ...n the junction box Note that you may gain better access to the junction box within the cabinet through the discharge end of the air cleaner This can be accomplished by removing the discharge louver wi...

Страница 6: ...6 ELECTICAL SCHEMATIC...

Страница 7: ...er inspecting the unit for a one or two month time period you will have established the proper cleaning interval for the prefilter When the MiracleAir unit no longer removes odors from the air it is t...

Страница 8: ...arge ends of the air cleaner The filters are resting in tracks inside the cabinet There is no locking mechanism to release REPLACING THE ODOR VAPOR FILTERS OF THE CM 12 DELUXE UNITS The standard Mirac...

Страница 9: ...9 PARTS LIST AND DIAGRAM...

Страница 10: ...EPAIR A showing by the original purchaser that the Product has not been altered repaired or serviced by anyone other than an authorized service technician using genuine AQE parts 4 UNAUTHORIZED PARTS...

Отзывы: