THE SK-94 RESCUE PARACHUTE MANUAL
str. 35
AIR-POL Sp. z o.o.
– 05-120 Legionowo, ul. Olszankowa 52, www.air-pol.com.pl
tel.: (+4822) 774 0711, (+4822) 784 1595, (+4822) 774 4832, fax (+4822) 784 9640, @: [email protected]
2.3.
INSPECTION OF THE INSTALLED STATIC LINE SYSTEM
Inspect correct assembly of the static line to the ripcord handle and
the ripcord pocket of the container harness and also the correct
routing of the static line to and within the pocket.
Inspection procedure:
Photo No. 7. Points for inspection.
1.
Connection
of
the
static line pocket to
the harness and the
connection of fastening
tapes
and
press
fasteners.
The
fastening
tapes
may
include
only
the
vertical tapes of the
harness.
2.
The
chest
strap
is
threaded
through
the
static line pocket „
loop”.
3.
The „Rapide” link is
secured to the ripcord
cable
between
the
ripcord
handle
and
ripcord housing.
4.
The
routing
of
the
static
line
passes
under the pocket top
flap.
5.
The
internal
rubber
bands securely retains
the
static
line
S-
folds.
2.4.
CONNECTING THE STATIC LINE SYSTEM TO THE AIRCRAFT
1.
Fit the parachute in accordance with the parachute manual
2.
Connect the static line snap-hook to the designated aircraft hard
point.
3.
Once seated in the aircraft check that the routing of the static
line is free from obstructions.
ATTENTION!
Ensure that the static line routes directly from the pocket to the
aircraft hard point. Any obstructions of the static line by the
parachute harness, the parachute pack and parts of the body can
obstruct the deployment of the parachute in an emergency and may cause
a static line „hang up” behind the aircraft.
2
1
3
4
5