4.3 

Fans 

Fan shaft and motor bearings are of permanently lubricated, sealed type and require no 
regular maintenance other than a check on their general condition. 
 

4.4 

Maintenance Schedule 

4.4.1 General 

  Air-change systems are designed for easy maintenance, with highest quality 

materials and components used throughout. 
 

  Preventative maintenance programs will vary according to actual working 

conditions and location and hours of usage by the client. 
 

  Air-change will be pleased to provide expert advice on special service 

requirements for particular installations. 

 

 

IMPORTANT: Failure to carry out regular maintenance may render 

warranty claims invalid if faults have been caused by lack of proper 
maintenance.  Air-change may request to see the maintenance  schedule 
carried out. 

4.4.2  Monthly Maintenance Schedules. 

  Filters should be inspected frequently immediately after installation to confirm 

the frequency of cleaning needed for the particular location. Regular 
change/clean of filters is necessary to ensure normal operating conditions. 

 

  Vacuum or wash filters, and dry thoroughly before replacing. 

 

 

The following is a guide until frequency according to usage is established. 

 

4.4.3  Three-Monthly Checks  

 

Repeat the Monthly Schedule 

 

  Clean Heat Exchanger (see section 4.1) 

 

  Check fan blower wheels for dirt build-up and tightness on shaft 

 

  Check all cabinet panels for correct fitting, alignment and seals, and clean 

cabinet as required. Ensure no insulation has been detached from panels. 
 

  All electrical terminals should be checked for tension on each maintenance 

visit

 with main switch off

 

4.4.4 Annual Maintenance 

  Repeat monthly and three-monthly checks 

Содержание WM-ERV

Страница 1: ...6 6563 Fax 08 8366 6501 Email sales sa air change com Queensland Unit 2 10 Central Court Hillcrest QLD 4118 PO Box 1175 Browns Plains QLD 4118 Phone 07 3809 3987 Fax 07 3809 3989 Email sales qld air c...

Страница 2: ...YSTEM COMPONENTS 7 3 1 General 7 3 2 System Components 7 3 2 1 Cabinet 7 3 2 2 Fans 7 3 2 3 Heat Exchanger 7 3 2 4 Filters 8 3 2 5 Electrical 8 3 3 Schematic Dimensional Data and Wiring Diagram Follow...

Страница 3: ...pply must be turned off at the electrical service box to avoid the possibility of shock injury or damage to equipment Note There may be more than one power supply circuit 1 2 Note to Installer Only tr...

Страница 4: ...or incomplete If major damage is apparent do not lift unit on to site without prior approval from Air change The unit was inspected prior to packing and was in perfect condition at that time Test loa...

Страница 5: ...eneration The introduced fresh air should also be above head height to avoid blowing directly on to occupants 2 1 3 External Inlet Outlet Considerations The exhaust discharge should be directed in a c...

Страница 6: ...m bottom 8 Timber or metal sealing batons for the rear of the unit will need to be supplied by the installer 9 Replace fan drawer heat exchanger and security screws filter and front grille 2 3 Electri...

Страница 7: ...fabricated wall and ceiling panels of are constructed of 1 2mm galvanised sheet metal bonded to 10mm aluminium polyethylene insulation 3 2 2 Fans Supply and exhaust fans are 80W centrifugal direct dri...

Страница 8: ...fitted to the return and fresh air intakes IMPORTANT If these units are being used during construction when adhesive sealers ducts new and used carpets are being installed make sure all equipment is f...

Страница 9: ...to NOTE Air Change can provide a heat exchanger replacement service on request WARNING Switch off unit before attempting to remove parts for cleaning 5 1 1 Enthalpy Heat exchanger Maintenance IMPORTAN...

Страница 10: ...ir change may request to see the maintenance schedule carried out 4 4 2 Monthly Maintenance Schedules Filters should be inspected frequently immediately after installation to confirm the frequency of...

Страница 11: ...WM ERV Manual 2005 2 doc2 11 Check cabinet for any paint chips or abrasions and treat accordingly Measure and record the amperage of each motor against nameplate details...

Страница 12: ...h will detail the service done to each unit This record is a summary of your service documentation for easy reference for management in case of a warranty claim Your equipment is a major investment an...

Отзывы: