background image

21

Please use the following table to note section information.

Tenant section

ID

Section information

ID

Section information

1

13

2

14

3

15

4

16

5

17

6

18

7

19

8

20

9

21

10

22

11

23

12

24

Main section

ID

Section information

ID

Section information

25

29

26

30

27

31

28

32

1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

ON

OFF

1 2 3 4 5 6 7 8

Section ID setting

Set the section ID (1 to 32) for this unit by the combination of the switch 2 
to 6 settings, as shown below.

*  Refer to 

1

 SYSTEM CONFIGURATIONS

 for details about "section".

NOTE :  

 Make sure not to repeat the same ID.

ID1 to ID24: Tenant sections 

ID25 to ID32: Main sections

Positions of switch 2 to 6

Section ID

SWITCH SETTINGS

Содержание GT SERIES

Страница 1: ... actual product The following manuals in multi languages of the GT system are also available from our website http www aiphone net The site can be accessed directly by reading the QR code on the right Operation manual Installation manual Setting manual Quick start installation guide Aiphone GT Setup Tool for Windows This manual explains how to install the multi building control unit GT MCX Refer t...

Страница 2: ...nditioner Places with steam or smoke near heating or cooking surfaces Places subject to sulfur such as hot springs Places near the shore or exposed to the direct sea breeze 3 Do not install this unit in any of the following locations where lighting or the ambient environment could impact the display on the video monitor due to the characteristics of the door station s camera Locations where is bri...

Страница 3: ...ance 8 2 COMPONENTS 9 3 MOUNTING 3 1 Cables 10 3 2 Mounting the multi building control unit GT MCX 11 4 WIRING 4 1 Multi building consisting of standard systems 12 4 2 Multi building consisting of expanded systems 16 5 SWITCH SETTINGS 20 6 CHECK FOR INSTALLATION 22 6 1 Finding a proper grounding point for power supply 22 6 2 Checking ground fault with tester 23 REGULATIONS Back cover WARRANTY Back...

Страница 4: ... is needed per section Up to 24 tenant sections can be set up in the same system One tenant section can support up to 500 residential tenant stations Main section Main section consists of main entrance stations and main guard stations One multi building control unit GT MCX is needed per section Up to 8 main sections can be set up in the same system A main section cannot include residential tenant ...

Страница 5: ...Video bus control unit GT VBC STD Max 1 Sub residential tenant station GT 2H L GT 2H Max 3 connectable to the residential tenant station GT 2C only Multi building control unit GT MCX 1 required 3 If GT DB V GT DB VN or an external door release button is connected to an entrance station that includes GT SW a maximum of 3 entrance stations can be connected to the system 4 Up to 3 entrance stations c...

Страница 6: ...pe and all in one type enabled Entrance station Modular type and all in one type enabled GT MKB N Guard station GT MKB N Multi building control unit GT MCX 4 Common trunk line 1 Common trunk line 2 LAN SYSTEM CONFIGURATIONS Multi building consisting of expanded systems 1 3 Tenant section expanded system 4 The multi building control unit GT MCX must be connected to common trunk line 1 Switching hub...

Страница 7: ... 1D only for residential tenant stations Main section expanded system Capacity Max 8 sections Device Capacity per section Entrance station GT DMB N or GT DMB LVN 7 Max 15 Common trunk line 1 max 7 Common trunk line 2 max 8 Guard station GT MKB N Max 3 Common trunk line 1 max 1 Common trunk line 2 max 2 Bus control units per common trunk line GT BC 1 required Power supply Expanded video bus control...

Страница 8: ... LVN GT VBC Standard system Entrance station Switching hub Switching hub The following diagrams show the wiring distances between the multi building control unit GT MCX and main section devices only Refer to the installation manual GT SYSTEM Standard Expanded System for wiring distances between residential tenant stations Expanded system Entrance station SYSTEM CONFIGURATIONS Wiring distance 1 4 ...

Страница 9: ...ply 3 100 m 330 150 m 490 150 m 490 14 Entrance station power supply 3 150 m 490 300 m 980 300 m 980 15 GT BCXB N power supply 3 3 m 10 5 m 16 5 m 16 Audio only main section audio R1 R2 total wiring distance per common line maximum 2 common trunk lines 1650 m 5400 2500 m 8200 2500 m 8200 1 DP Distribution Point Not provided by Aiphone except for Europe and North America 2 Do not route a CAT5e 6 ca...

Страница 10: ...able or coaxial cable x2 To connect low voltage wires either crimp them with a crimp sleeve or solder them and then insulate by covering with insulating tape Crimping with a crimp sleeve Solid conductor Solid conductor Stranded conductor Stranded conductor Soldering Insulating tape Insulating tape Crimp sleeve 1 Line up solid and stranded conductors and crimp them 1 Twist the stranded conductor ar...

Страница 11: ...l Click the unit into place 2 When removing the unit pull the lock release lever down The GT MCX cannot be mounted directly to a wall surface DIN rail DIN rail included Lock release lever Mounting the multi building control unit GT MCX 3 2 MOUNTING ...

Страница 12: ...led wiring diagrams of entrance stations guard stations and residential tenant stations Each pair of wires should be in a separately jacketed cable audio video and power wiring To prevent shorts unused cables should be insulated Multi building control unit GT MCX Common area Bus control unit GT BC 4 WIRING Multi building consisting of standard systems 4 1 DP Distribution Point Not provided by Aiph...

Страница 13: ...g other manufacturers products refer to the instruction manuals for those products LAN NP Non polarized Audio signal line Video signal line Power supply line CAT5e 6 cable 100BASE TX WIRING PS24 230 V AC 50 60 Hz 24 V DC2A N L 100V 240V 50 60 Hz 24V DC 2 A PS 2420DM PS 2420 PS 2420S PS 2420UL PS 2420BF To entrance stations To residential tenant trunks 2 3 Switching hub requirement third party prod...

Страница 14: ...ontrol unit GT MCX WIRING Main section standard system DP Distribution Point Not provided by Aiphone except for Europe and North America Common area 2 2 NOTE Do not route a CAT5e 6 cable outdoors from a multi building control unit directly When routing a CAT5e 6 cable outdoors from a switching hub use a model that supports outdoor wiring 1 Refer to the installation manual GT SYSTEM Standard Expand...

Страница 15: ...5e 6 cable 100BASE TX PS24 230 V AC 50 60 Hz 24 V DC2A N L 100V 240V 50 60 Hz 24V DC 2 A PS 2420DM PS 2420 PS 2420S PS 2420UL PS 2420BF To entrance stations 2 DP Distribution Point wiring example When using a distribution terminal block it is not provided by Aiphone except for Europe and North America After making connections be sure to check that there are no disconnected or loose parts GT BC DP ...

Страница 16: ...d main sections The wiring methods differ depending on the equipment used Refer to the installation manual GT SYSTEM Standard Expanded System sections 4 2 to 4 4 for the detailed wiring diagrams of entrance stations guard stations and residential tenant stations Entrance stations Sub trunk line 1 B Make connections in the same method as common trunk line 1 However do not connect the GT MCX to comm...

Страница 17: ...ected For connecting other manufacturers products refer to the instruction manuals for those products WIRING PS24 230 V AC 50 60 Hz 24 V DC2A N L 100V 240V 50 60 Hz 24V DC 2 A PS 2420DM PS 2420 PS 2420S PS 2420UL PS 2420BF Each pair of wires should be in a separately jacketed cable audio video and power wiring To prevent shorts unused cables should be insulated entrance stations guard station 4 Re...

Страница 18: ...ation 3 Entrance station 2 Entrance station 1 Guard station Common trunk line 1 Guard station Bus control unit GT BC Entrance stations Make connections in the same method as the common trunk line 1 However do not connect the GT MCX to the common trunk line 2 Common trunk line 2 DP Distribution Point Video bus control unit GT VBC 1 NOTE The GT MCX must be connected to the common trunk line 1 2 Refe...

Страница 19: ...E TX PS24 230 V AC 50 60 Hz 24 V DC2A N L 100V 240V 50 60 Hz 24V DC 2 A PS 2420DM PS 2420 PS 2420S PS 2420UL PS 2420BF GT VBC guard station entrance stations 3 Do not route a CAT5e 6 cable outdoors from a multi building control unit directly When routing a CAT5e 6 cable outdoors from a switching hub use a model that supports outdoor wiring 3 3 Switching hub 4 4 Switching hub requirement third part...

Страница 20: ... 50 The IP address is set as follows 192 168 1 α α 50 Section ID Example Section ID 11 IP Address 192 168 1 61 For detailed explanation of IP setting please refer to GT SYSTEM Multi building system Setting manual OFF DHCP is active An IP address will be assigned automatically OFF 2 Initialization of the settings The set date is not initialized Follow the procedure below OFF How to initialize GT MC...

Страница 21: ...4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8 ON OFF 1 2 3 4 5 6 7 8...

Страница 22: ...ntry it will be considered a proper grounding point If the needle does not reach the power supply value it will not be considered a proper point 3 2 Find the grounding point by repeating this step until the needle points to the proper value 4 Connect the power supply ground terminal with the grounding point found in step 3 Hot side Actual Hot side Grounding point Actual grounding point Actual grou...

Страница 23: ...the power supply ground terminal put the other to the following terminals to be inspected 4 If the tester needle does not swing in step 3 it will be judged no ground fault If the tester needle swings there is a ground fault in wiring between the power supply and the inspected point The same is true in the case where the needle swings reversely Solution Divide the wiring into sections or trunk line...

Страница 24: ...calls Aiphone will not provide compensation for any loss or damage incurred by the breakdown or malfunction of its products during use or for any consequent inconvenience or losses that may result AIPHONE CO LTD NAGOYA JAPAN http www aiphone net WARRANTY REGULATIONS FCC This device complies with part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cau...

Отзывы: