Installation Instructions
GB
GB-06
Installation of Windpipe
2
1.Align the boss of windpipe
fastener with the “ ”and
insert to the end.
Schematic diagram of front installation
Dismantle by pulling in forward direction.
Allow for moving up and down.
2.Rotate the fastener clockwise,
and lock by aligning the boss
with the“ ” .
Align the fastener with the first and
second support rods and set at positions.
Schematic diagram of front installation
Shorten the supporting rod to suitable height
Installation of hanging ironing board
3
145*210MM/莫思妮,16156000A25922 MY-GD20D4W__310100JHJ 说明书/YDX,20170622