
Chapter 2 Hardware Setup
8
SB102-VG User's Manual
The PHM sits level with the processor socket assembly. The PHM is NOT installed
properly if it does not sit level with the processor socket assembly. Once the PHM
is seated over the processor socket assembly, the four heat sink torque screws
must be tightened in order as shown below.
Processor Heat Sink – Top View with Screw Tightening Order
note :
Failure t o tighten the heat sink screws i n the specified order
may cause damage t o the processor socket assembly. Heat s ink
screws should b e tightened t o 12 In-Lbs T orque o n indicated
order on the top of the heat sink label.