INSTALLATION INSTRUCTIONS
Position the tailgate unit
- Install mounting brackets
- Place the mounting brackets to its exact final position.
- Clamp the mounting brackets on the truck frame.
- Fix the mounting brackets on the main frame.
- Drill 16mm (5/8”) holes into the chassis and mounting bracket.
Screw M16 (5/8”) is 8.8 Strength (Grade 8)
Max. Torque 195Nm (145ft lbs.)
Drill two holes in each bracket, put a bolt in each one and secure. Then drill the other holes.
NUMBER OF SCREWS PER MOUNTING BRACKET: 4 pieces
M16x50
- MOUNT THE POWER PACK AGAIN. FASTEN THE 4 SCREWS
M10x25
Truck Main Frame
Screw Clamp
Mounting Bracket
Truck Main Frame
Screw Clamp
Mounting Bracket
4 HOLES
ø 16mm (5/8“)
7
Check the
right-angled
Содержание HTK-500ST/AL
Страница 17: ...17 ...
Страница 18: ...18 ...
Страница 19: ...19 ...
Страница 20: ...20 ...
Страница 21: ...21 ...
Страница 22: ...22 ...
Страница 23: ...23 ...
Страница 24: ...24 ...
Страница 25: ...25 ...
Страница 26: ...26 ...
Страница 27: ...27 ...
Страница 28: ...28 ...
Страница 29: ...29 ...
Страница 30: ...30 ...
Страница 31: ...31 ...
Страница 32: ...32 ...