agui OKATT DNP16-01 Скачать руководство пользователя страница 5

DNP16-01 

MANUAL FOR INSTALLATION AND USE

 

 

By:  E. Irazu. 
Reviewed by: J. Fernández 

DNP16-01. PIVOTING BUFFER SUPPORT

 

BRAND PRODUCT 

DEPARTMENT

 

 

 

 

 

 

5

 

Rev:2 

 

Marking and drilling of fixture points:

 

 

Once the height has been adjusted, position and mark the drill holes 
required to fix the buffer support to the walls. The fixture points are: 

 

-2 in the pit, on the lateral support slots. 
 

-4 on the unit at two heights (2+2), on the upper and lower slots. 

 

(The wall plugs used must guarantee that each fixture can  
withstand a tensile load of 75 kg.) 
 
It is important to choose appropriate wall plugs for the type of space 
and to follow manufacturer's directions for proper installation. It is 
essential to observe the torque value, which will vary depending on 
model and manufacturer. 

 
 
 

 

 

Plumbing and fixing the buffer support. 

 

Reposition the buffer support and, checking that the whole installation is perfectly level on all sides, tighten 
the fixtures and check all levels again. 
 
For the levelling and adjusting if necessary, use side supports and the chocks provided in the bag of 
accessories. 
 
Fixtures or chocks are used to level the mechanism 
and can compensate for any irregularities in the pit. 
It is important that they are mounted in the position 
indicated in this manual and to check that the tube 
fits tightly against them when inactive. 
 
The image shows to possible arrangements, using 
fixtures for 35-80 and with chocks for smaller 
measurements.   

 

 
 
 
 
 
 
 
 
 
 
 

Содержание OKATT DNP16-01

Страница 1: ...AGUI cannot accept liability for any damage caused by incorrect handling or as the result of action other than that indicated in this manual The product guarantee may be rendered invalid if used inco...

Страница 2: ...a selection of chocks between the buffer support and the wall and 35 80 continuous mm regulation through the use of fixtures VERTICAL BUFFER SUPPORT KIT VERTICAL BUFFER SUPPORT BAG OF ACCESSORIES The...

Страница 3: ...l fixture There are three possible situations Direct The buffer support is mounted directly onto the wall With chocks When the distance to the wall is between 5 30 5 mm intervals With L fixtures When...

Страница 4: ...o adjust how the plate lies against the buffer The image shows the assembly position for the supports Regulation of lateral supports It is very important that when the buffer support is not activated...

Страница 5: ...ufacturer s directions for proper installation It is essential to observe the torque value which will vary depending on model and manufacturer Plumbing and fixing the buffer support Reposition the buf...

Страница 6: ...is to guide the insertion of the cables to avoid excessive angles or entrapment The image shows how to position these pulleys Pulleys 1 and 2 are placed on the floor of the pit to align the cable with...

Страница 7: ...g them at the exact length required to prevent any excess loose cables inside the pit The green cable can be shortened from the handle but loosening the set screw and sliding it until the cable is at...

Страница 8: ...d to the electricity supply following the indications on the diagrams Right side Monitors the active buffer support position Left side Monitors the resting buffer support position Check operation Once...

Страница 9: ...ems with reduced headroom the maintenance technician must first open the door of the lowest floor and activate the vertical buffer support The mechanism is activated and deactivated from floor level w...