DNP16-01. PIVOTING BUFFER SUPPORT

 

BRAND PRODUCT 

DEPARTMENT

 

 

 

 

 

 

2

 

Rev:2 

3)

 

COMPONENTS OF THE KIT. 

 

The  kit  consists of the  vertical buffer support and a  bag of accessories  with a set of chocks  and fixtures  to 
support possible drops and compensate depth X to the fixation wall. The bag contains pieces for a regulation 
5-30 (at 5 mm intervals) interspersed with a selection of chocks between the buffer support and the wall, and 
35-80 (continuous mm regulation) through the use of fixtures. 
 
 

VERTICAL BUFFER SUPPORT KIT 

 

(VERTICAL BUFFER 

SUPPORT) 

 

(BAG OF ACCESSORIES) 

 

The  bag  of  accessories  includes  the 
items  necessary  to  be  able  to 
support  the  position  of  the  buffer 
support  against the wall to between 
5 and 80 mm (at 5 mm intervals) and 
the  lateral  support  used  for  the 
mounting  and  correct  positioning  of 
the buffer support over the buffer: 

- 2x lateral supports 

- 4 x adjustable wall fixtures 

- 2 x 5mm chocks 

- 2 x 10 mm chocks 

- 4 x 30x30x10 rings 

- M8x22 screw. 

- 8 x M8 bolts. 

- 4 x washers 

- 2 x clamp rings 

 
 
 
 

Содержание OKATT DNP16-01

Страница 1: ...AGUI cannot accept liability for any damage caused by incorrect handling or as the result of action other than that indicated in this manual The product guarantee may be rendered invalid if used inco...

Страница 2: ...a selection of chocks between the buffer support and the wall and 35 80 continuous mm regulation through the use of fixtures VERTICAL BUFFER SUPPORT KIT VERTICAL BUFFER SUPPORT BAG OF ACCESSORIES The...

Страница 3: ...l fixture There are three possible situations Direct The buffer support is mounted directly onto the wall With chocks When the distance to the wall is between 5 30 5 mm intervals With L fixtures When...

Страница 4: ...o adjust how the plate lies against the buffer The image shows the assembly position for the supports Regulation of lateral supports It is very important that when the buffer support is not activated...

Страница 5: ...ufacturer s directions for proper installation It is essential to observe the torque value which will vary depending on model and manufacturer Plumbing and fixing the buffer support Reposition the buf...

Страница 6: ...is to guide the insertion of the cables to avoid excessive angles or entrapment The image shows how to position these pulleys Pulleys 1 and 2 are placed on the floor of the pit to align the cable with...

Страница 7: ...g them at the exact length required to prevent any excess loose cables inside the pit The green cable can be shortened from the handle but loosening the set screw and sliding it until the cable is at...

Страница 8: ...d to the electricity supply following the indications on the diagrams Right side Monitors the active buffer support position Left side Monitors the resting buffer support position Check operation Once...

Страница 9: ...ems with reduced headroom the maintenance technician must first open the door of the lowest floor and activate the vertical buffer support The mechanism is activated and deactivated from floor level w...

Отзывы: