
8
motor housing 25) should be cleaned out.
•
After approx. 100 hours of operation, check the motor brushes and replace if necessary.
Clean the motor housing.
•
After approx. 200 hours of operation, renew the grease filling in the gearbox.
To verify that the protective insulation remains intact, the machine must be subjected to a
technical safety test afterwards. For this reason, this work must be performed exclusively by a
professional workshop.
Environment Protection
Do not open worn out machines and return to the collection facilities provided for recycling.
Storage
The unit should be stored in a dry place where it is protected against freezing.
Guarantee
We guarantee appliances in accordance with statutory/country-specific regulations. Proof of
purchase by invoice or delivery note. The guarantee is only valid with a stamp of your dealer
on the guarantee-card, which shows the date of purchase and the serial number of the item.
The data on your bill or delivery note must be similar to the data on the guarantee card.
Содержание EV10ELM
Страница 1: ...1 Original instructions ...
Страница 2: ...2 01 25 31 32 34 40 41 ...
Страница 9: ...9 WIRING ...
Страница 12: ......