![Agora Models Shelby GT500 1967 Super Snake Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/agora-models/shelby-gt500-1967-super-snake/shelby-gt500-1967-super-snake_build-instructions_2869148007.webp)
7
AGORA
MODELS
Stage 24: Front Floor Pan
F I N I S H S E C U R I N G T H E F L O O R PA N T O T H E C H A S S I S
Make sure the tabs are flush with the chassis, then place 4 x TYPE
MD02 screws in the anchor points indicated in picture 4. Tighten
the screws, but be careful not to overtighten. Then place 2 x TYPE
MD06 screws in the anchor points located on each side of the
transmission tunnel, as shown in picture 5.
Finish by fixing 2 x TYPE MD06 screws on the raised, sloping
section of the assembly, as shown in picture 6.
4
5
6
Содержание Shelby GT500 1967 Super Snake
Страница 4: ...4 AGORAMODELS SHELBY SUPER SNAKE Stage 23 complete Stage 23 Middle Chassis...
Страница 8: ...8 AGORAMODELS SHELBY SUPER SNAKE Stage 24 complete Stage 24 Front Floor Pan...
Страница 17: ...17 AGORAMODELS SHELBY SUPER SNAKE Stage 27 Front Chassis Stage 27 complete...
Страница 22: ...22 AGORAMODELS SHELBY SUPER SNAKE Stage 29 Steering Rods Stage 29 complete...