2
AGORA
MODELS
Stage 23: Middle Chassis
Your fourth Pack starts with
connecting the Middle Chassis to
the Rear Main Chassis Assembly.
Name
Quantity
Middle Chassis
1
Screws TYPE MD06
5 [inc. 1 spare]
S TA G E 2 3 PA R T S L I S T
A DV I C E F R O M T H E E XP E R T S
Spare screws are included with each part.
Please make sure you don’t mix up the screws. They look quite
similar, but the threads do vary slightly. Using the wrong screws
may damage the parts.
When securing parts together using multiple screws, fit each
screw loosely to ensure all the parts are correctly aligned before
gently tightening them firmly, but not overtight, in the order in
which you placed them.
The screwdriver can be magnetised by stroking it with a magnet
(fridge magnet, etc.) enabling it to hold the screws and make
assembly easier.
If a screw is tight going into a metal part, do not force it as
you may shear the head off. Remove it and put a tiny smear of
Vaseline, soap or light oil on the thread. That will lubricate it and
make it easier to drive home.
!
Middle Chassis
Screws
Содержание Shelby GT500 1967 Super Snake
Страница 4: ...4 AGORAMODELS SHELBY SUPER SNAKE Stage 23 complete Stage 23 Middle Chassis...
Страница 8: ...8 AGORAMODELS SHELBY SUPER SNAKE Stage 24 complete Stage 24 Front Floor Pan...
Страница 17: ...17 AGORAMODELS SHELBY SUPER SNAKE Stage 27 Front Chassis Stage 27 complete...
Страница 22: ...22 AGORAMODELS SHELBY SUPER SNAKE Stage 29 Steering Rods Stage 29 complete...