background image

© 201

9

 Agnetix Inc. All Rights Reserved. Specifications subject to change 

7965 Dunbrook Road - Suite I - San Diego, CA 92126

5

agnetix.com

Agnetix

Product Guide – Specifications & Installation

Agnetix A3 1200

1. Start Installation

Verify that all supporting equipment is in place. This includes physical support, electrical, and plumbing. Ensure all
additional parts and tools are available, including:

Brackets and mounting hardware as specified on your plan

Safety tether if required in your area

Tools for attaching brackets and hardware as needed

Power Cabling components

Network cables

Plumbing parts and specified tubing

2. Unpack and Prepare Fixtures for Installation

Note: The installation process requires a minimum of 2 people.

Carefully inspect the boxes for damage or loss during transit. Each carton contains two (2) fixtures.

Cover your work surface with a towel or other soft material to prevent scratching the fixtures and lenses.

Open the box and remove the top packing materials. Place these upside down on your work surface. Remove the fixture

and place into the packing materials on your work surface. Inspect the fixture, connectors, lenses and copper tubes for 

damage. Small deformations of the tubes may be corrected with the gentle use of a tubing expander. Do not remove the 

protective film from the lenses until commissioning in Step 7.

If brackets are specified in your plan, attach them to the fixtures while the protective supports are still in place.

Remove the protective end support and one fixture, while a second person supports the second unit.

The protective end support should be replaced if the second unit will not be immediately installed.

Lay the fixture on its side on your work surface, and inspect the fixture for damage.

Do not rest the fixture on the high transmission lens. They may be easily scratched or cracked.

3. Mounting

Mount the fixture as directed in your plan. 

The Light Spine mounting rail contains ¼ inch holes as well as 3/8 x 1/2 inch slots on an inch referenced grid spaced as 

shown in 

A3-1200 Basic Dimensions

 diagram. Bolts of ¼ inch and larger diameter are appropriate for mounting the fixture.

Locknuts and/or lock washers are recommended. Maintain fixture spacing as directed in your plan. It may be helpful to 

tighten bolts after plumbing connections are completed.

Follow all local codes and safety rules for mounting of the fixtures. A safety cable (not supplied) may be required in some 

jurisdictions. The middle slot can accommodate such a device. It may be helpful to mount brackets for mounting or for 

accessories while the fixture is on your work surface.

Содержание A3 1200

Страница 1: ...ble for Wet Locations ETL Listed PRODUCT SPECIFICATIONS Power 1200W Efficacy 2 23 µmol J A3 Standard Density 2 45 µmol J A3 DD Double Density Spectrum White 5000K 660nm Red others by request Beam Angle 120º Cooling Twin 1 2 Copper Tubes 1 3gpm tube PHYSICAL Housing Aluminum Extrusion Dimensions 36 x 4 x 5 Tube Length 40 Weight 15 Lbs Mounting Through bolts on Light Spine Bolts not included Lens In...

Страница 2: ... A3 1200 DD contain different LED pattern with twice the LED count Light Spine mounting system 5 0 25 25 3 8 x 7 8 3 7 2 0 2 0 3 33 Nominal 40 Nominal 36 5 5 12 14 0 2 0 Downward USB Port 1 RJ 45 Ethernet Network Port w POE RJ 45 Ethernet Network Port w POE USB Port 2 7 8 Power Cable System Connection LED Module 2 LED Module 1 LED Module 3 RJ 45 Ethernet Network Port w POE 1 2 Copper Tubing Do Not...

Страница 3: ... table to determine the acceptability of the power source Connection to a source in excess of 277V will cause immediate fixture destruction and is not covered by the warranty It is recommended and usually most cost effective to use a step up down transformer if needed and to provide 480Y 277 3P 5W service to operate the fixture at 277V where possible 6 Units per 30A cable 3 units per 15A cable Sta...

Страница 4: ...lity The basic procedure is recommended to produce an appropriate plan 1 Determine your desired PPFD and lighted area for your chamber 2 Determine room dimensions and canopy dimensions 3 Calculate the required number of fixtures N PPFD Area m Fixture PPF 4 Choose the desired row and column spacing and the physical layout of your facility 5 Layout the fixtures as desired and check that they fit rea...

Страница 5: ...tubes may be corrected with the gentle use of a tubing expander Do not remove the protective film from the lenses until commissioning in Step 7 If brackets are specified in your plan attach them to the fixtures while the protective supports are still in place Remove the protective end support and one fixture while a second person supports the second unit The protective end support should be replac...

Страница 6: ... correct room row and column of your facility If directed adjust the user power settings as specified by your plan 6 Inspection Do not operate the fixtures before inspection by a qualified person or inspector as required in your jurisdiction Inspect the system for damage and to ensure proper installation of all components Perform formal inspection as required Pressure test as required 4 Make Cable...

Страница 7: ...zes a UL2237 Multi point Interconnection Power Cable Assemblies for Industrial Machinery PVVA listed power cable system to reduce the time and expense of power wiring The system is composed of Outlets 15A and 30A to be installed by your electrical contractor Cables 15A and 30A Tees 15A and 30A Drop Tees 15A Reducers 30A to 15A At 277V up to 6 fixtures can generally be operated from one 30A cable o...

Страница 8: ...INSTALLING IN WET OR DAMP LOCATIONS ENSURE THAT ALL PORTS NOT IN USE ARE CAPPED ALL CONNECTIONS ARE MADE WITH WATERPROOF CONNECTORS OR BOOTS ALL CONNECTIONS ARE PROPERLY TIGHTENED ATTENTION LE PRODUIT DOIT ÊTRE INSTALLÉ CONFORMÉMENT AU CODE D INSTALLATION APPLICABLE UNE PERSONNE FAMILIALE AVEC LA CONSTRUCTION ET L EXPLOITATION DE PRODUIT ET LES DANGERS IMPLIQUES ATTENTION INSTALLER LE PRODUIT CONF...

Отзывы: