Test System Installation
21
Chapter 2
Test System Installation
This chapter describes how to ground the system, connect power to the
system, make PC and peripheral connections and how to backup the system
software. Chapter contents are:
•
Grounding and Connecting Power to the System . . . . . . . . . page 22
•
PC and Peripheral Connections. . . . . . . . . . . . . . . . . . . . . . . page 25
•
Fixture and UUT Connections . . . . . . . . . . . . . . . . . . . . . . . page 27
•
Getting Started . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 28
•
Making a Back Up System Image. . . . . . . . . . . . . . . . . . . . . page 28
Note
An uncrating document (Agilent part number E2230-90025) is attached to
the outside of the crate and describes how to uncrate the system.
Содержание TS-5410
Страница 7: ...7 Doc Placeholder Page...
Страница 8: ...8...
Страница 10: ...10 Contents...
Страница 20: ...20 Site Preparation Chapter 1...