Test System Installation
27
Power Strip Breakers
The Filtered Power Strip contains two 15A breakers, one on Line, one on
Neutral (Figure 2-7). When a breaker opens (trips), a red mark can be seen
on the breaker switch. Press the breaker button to reset.
Fixture and UUT Connections
The Test System Interface on the front of the system allows you to make
connections between the test system and the UUT fixturing. Refer to the
E22xxA Test System Interface Wiring Guide for more information.
Figure 2-7. Filtered Power Strip Circuit Breakers