Making Swagelok Connections
A
Agilent Intuvo 9000 GC Installation
97
Using a Swagelok Tee
To supply gas from a single source to more than one input, use a
Swagelok Tee.
Materials needed:
•
1/8-inch preconditioned copper tubing
•
Tubing cutter
•
1/8-inch Swagelok nuts and front and back ferrules
•
1/8-inch Swagelok Tee
•
Two 7/16-inch wrenches
•
1/8-inch Swagelok cap (optional)
Procedure:
1
Cut the tubing where you want to install the Tee. Connect the
tubing and Tee with a Swagelok fitting. See
Figure 23
Swagelok tee
NOTE
Do not combine valve actuator air with flame ionization air. The
valve action will cause major upsets in the detector signal.
Cap
Tee fitting
Nut and
ferrules
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...