Installing the GC
1
Agilent Intuvo 9000 GC Installation
45
Connect tubing to gas supplies and purge.
Connect the tubing to the gas source
1
Turn off all gases at their sources. Measure the length of
tubing needed to connect the gas supply outlet to the inlet
fitting on the GC. Take into account any traps or tees you will
need.
2
Cut the tubing to length with a tubing cutter (
).
Figure 5
Typical tubing cutter
3
Connect the tubing to the gas source with a Swagelok fitting.
See
, “Making Swagelok Connections.
4
Purge the supply lines for a few minutes before connecting
them to the GC flow modules.
NOTE
If you need more than 4.5 m (15 feet) supply tubing for a gas source, use
1/4-inch tubing with appropriate hardware. See the
Agilent Intuvo
9000 GC, GC/MS, and ALS Site Preparation Guide
for part numbers.
Cutting wheel
Good cut
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...