background image

Agilent G6697A IDP-10 Dry Scroll Vacuum Pump for  

Agilent 7000 and 7010 Series GC/MS

Installation Guide

Содержание G6697A IDP-10

Страница 1: ...Agilent G6697A IDP 10 Dry Scroll Vacuum Pump for Agilent 7000 and 7010 Series GC MS Installation Guide...

Страница 2: ...ied warranties of mer chantability and fitness for a particular purpose Agilent shall not be liable for errors or for incidental or consequen tial damages in connection with the furnishing use or perf...

Страница 3: ...portant Safety Warnings 7 General Safety Precautions 8 Cleaning 9 Recycling the Product 9 Parts Identification 9 Site Preparation 10 2 Installation Removing the Existing Foreline Pump from the Agilent...

Страница 4: ...4 Agilent G6697A Oil Free IDP 10 Dry Scroll Pump Installation Guide...

Страница 5: ...t Safety Warnings 7 General Safety Precautions 8 Cleaning 9 Recycling the Product 9 Parts Identification 9 Site Preparation 10 This guide describes how to replace an Edwards RV5 Oil Sealed Rotary Vane...

Страница 6: ...tion provided by the instrument may be impaired Whenever the safety protection of the IDP 10 Scroll Vacuum Pump for Agilent 7000 and 7010 Series GC MS has been compromised disconnect it from all power...

Страница 7: ...eries GC MS Agilent Technologies assumes no liability for the customer s failure to comply with these requirements Prepare the installation site in accordance with the site preparation specifications...

Страница 8: ...ulate hot air Always position the front end of the IDP 10 Scroll Vacuum Pump for Agilent 7000 and 7010 Series GC MS where it can draw cool air A pump exhibiting high surface temperature should be turn...

Страница 9: ...Table 1 lists the contents of the IDP 10 Scroll Vacuum Pump for Agilent 7000 and 7010 Series GC MS kit Table 1 IDP 10 Dry Scroll Pump for Agilent 7000 and 7010 Series GC MS contents list Part Quantity...

Страница 10: ...for Agilent 7000 and 7010 Series GC MS as listed in Table 2 NOTE Where conflicts exist between these criteria and those of any co located equipment the equipment with the tighter tolerances takes pre...

Страница 11: ...e Agilent 7000 and 7010 Series GC MS 12 Unpacking the IDP 10 Pump 14 Assembling the Foreline Hose 16 Installing the IDP 10 Pump 18 Installing the Ferrite 21 This chapter describes how to replace a rot...

Страница 12: ...g begins the automated shut down of the GC MS Refer to the Agilent 7000 7010 Series Triple Quadrupole Operating Manual for details 2 Turn off the GC MS 3 Disconnect the instrument from its power outle...

Страница 13: ...mp Installation Guide 13 5 Disconnect the other end of the foreline hose from the existing foreline pump 6 Dispose of the existing pump foreline hose and fittings in accordance with all local regulati...

Страница 14: ...the shipping container All supplied components are in smaller boxes or bags within the shipping container 3 Remove the boxed and bagged items from the shipping container 4 Open boxes and bags and the...

Страница 15: ...built in pump handles Figure 4 at either end of the pump carefully remove the pump from the box 5 Retain the shipping container and all packing materials 6 Inspect the pump and other components for d...

Страница 16: ...hose adapter connector face on a cloth on your work surface c Slide the end of the foreline hose over the KF25 hose adapter d Secure the KF25 hose adapter in the foreline hose by positioning the hose...

Страница 17: ...hing the hose to the gauge adapter as shown in Figure 6 b Spray the end of the GC MS foreline gauge adapter with isopropyl alcohol IPA solvent c Slide the end of the foreline hose over the end of the...

Страница 18: ...e end of the new foreline hose assembly to the IDP 10 pump using the Centering Ring included with the pump and the NW25 Clamp 0100 0549 included with the kit as shown in Figure 7 3 Tighten the hinged...

Страница 19: ...port of the IDP 10 pump using the NW16 Clamp and Centering Ring provided with the pump as shown in Figure 8 on page 19 and Figure 9 on page 19 Figure 8 Installing IDP 10 Exhaust Filter NOTE The exhaus...

Страница 20: ...shown in Figure 11 7 Turn on the Agilent GC MS 8 Allow the GC MS to run continuously for approximately 2 hours to remove any potential excess moisture from the system Figure 10 Power Cord Connection...

Страница 21: ...cell signal cable has a ferrite installed on it This applies to the 7000 and 7010 Series GC MS 1 Open the analyzer door cover to view the wiring harness and collision cell board as shown in Figure 12...

Страница 22: ...eps and proceed to the next section 3 Remove the ferrite Figure 14 from the package Do not close it until it is around the collision cell signal cable 4 If the ferrite arrives in the closed position a...

Страница 23: ...stalling the Ferrite Agilent G6697A Oil Free IDP 10 Dry Scroll Pump Installation Guide 23 5 Locate the label section of the collision cell signal cable as shown in Figure 16 Figure 15 Open the ferrite...

Страница 24: ...nt G6697A Oil Free IDP 10 Dry Scroll Pump Installation Guide 6 Position the ferrite behind the cable as shown in Figure 17 7 Close snap the ferrite onto the cable as shown in Figure 18 Figure 17 Posit...

Страница 25: ...Agilent G6697A Oil Free IDP 10 Dry Scroll Pump Installation Guide 25...

Страница 26: ...this manual and any information contained herein including but not limited to the implied warranties of merchantability and fitness for a particular purpose Agilent shall not be liable for errors or f...

Отзывы: