Installation Guide: TCD-to-FID Series Connection

2

In the same manner, remove two screws along the lower edge 
of the right side (electronics) panel. Slide the panel slightly to 
the rear and lift it off.

3

Remove the back panel by removing two screws at its bottom 
edge, loosening two screws at its top edge, and the lifting off 
the two top screws.

4

Finally, remove the rear top cover by removing four screws, 
two at each end.

Raising the TCD Block

1

Cap the detector base (column/makeup gas adapter 
connection).

2

Remove the detector thermal cover by removing two screws, 
one from each side of the cover.

Содержание G4319A

Страница 1: ...ector must be removed and replaced To achieve a standard factory configuration the TCD must be located in the front detector position If you are installing a new FID at this time refer to its installa...

Страница 2: ...or assembly Swage nuts and ferrules Tools Electrostatic protection such as a grounded wrist strap T 20 Torx screwdriver 7 16 inch wrench Steps 1 Preparing the GC 2 Raising the TCD Block 3 Adjusting Ve...

Страница 3: ...and then sliding the cover to the left to free its right hinge pin Perform this procedure only if necessary to add a new detector or to remove and replace an existing detector Remove the panels indic...

Страница 4: ...off 3 Remove the back panel by removing two screws at its bottom edge loosening two screws at its top edge and the lifting off the two top screws 4 Finally remove the rear top cover by removing four s...

Страница 5: ...ion Guide TCD to FID Series Connection 5 3 Cap the vent tube at the top of the detector Thermal cover Insulation Delta PRT sensor Vent tube Heater and PRT Vent tube support Retaining screw Detector ba...

Страница 6: ...installed into the top of the oven remove the retaining screw securing the vent tube support and remove the support 2 Carefully bend the vent tube downwards to be alongside the detector column make up...

Страница 7: ...to pack around the bottom and sides of the detector The goal is to fill all voids around the detector body as it is placed into the cavity 6 Remove caps from the detector base and from the vent tube...

Страница 8: ...t and Vespel ferrule to install the 1 4 to 1 8 inch adapter into the FID 3 Again following proper swaging procedures use the 1 8 inch brass tubing nut back ferrule and front ferrule to connect the TCD...

Страница 9: ...tion Guide TCD to FID Series Connection 9 4 Restore gas supplies and following leak test procedures described in the Maintenance and Troubleshooting manual check for leaks particularly at all new conn...