42
Installation and Operation Guide
4
Operation
Select restrictors
Start up the spreadsheet "splitter_calc.xls" in Excel. We will choose to have
2 mL/min go to the ECD initially. With a split ratio of 3, this will send
6 mL/min to the MSD. This flow is acceptable with a performance turbo
system but will give somewhat degraded detection limits. Fill in the input
column as shown (
Figure 19
) with the ECD assumed to be Detector 1 and the
MSD as Detector 2.
Figure 19
The Effluent Splitter calculator
Содержание G3180B
Страница 4: ...4 Installation and Operation Guide...
Страница 16: ...16 Installation and Operation Guide 1 Introduction...
Страница 50: ...Installation and Operation Guide 50...
Страница 51: ......
Страница 52: ...Agilent Technologies Agilent Technologies Inc Printed in USA April 2006 G3180 90120...