Procedure
MS 120 Major Maintenance Service and Repair Manual / 87-900-155-01 (A.00)
93
Step
Description / Photo
77.
Protective Earth continuity test
CAUTION!
Using a tester/ohmmeter verify that the isolation is provided between the
protective (earthing) conductor terminal and the accessible conductive parts of
the unit that are required to be connected to the protective conductor terminal is
below 0.1 Ohm. One probe (terminal pin) of the tester must be in contact with
the middle pin of control socket (earth connection) [1], the other probe (terminal
pin) of the tester must be in contact with a not painted part of the pump like the
upper side of the eyebolt fixing adapter [2] (highlighted in the second picture).
[1]
[2]
Содержание G2571-64000
Страница 3: ...MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 3 MS 120 Major Maintenance ...
Страница 4: ...MS 120 Major Maintenance 4 MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 ...
Страница 6: ...Contents 6 MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 ...
Страница 14: ...Prescrizioni di sicurezza 14 MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 ...
Страница 24: ...Sicherheitsvorschriften 24 MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 ...
Страница 32: ...Prescriptions de sécurité 32 MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 ...
Страница 40: ...Safety rules 40 MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 ...
Страница 78: ...Procedure 78 MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 Step Description Photo 56b ...
Страница 101: ...Spare Parts List MS 120 Major Maintenance Service and Repair Manual 87 900 155 01 A 00 101 ...