Installation
2
Installation, Operation, and Maintenance
57
Part 1, Installation
Orientation
The G2912A ALS controller is designed to be installed in a horizontal
orientation as shown in
. If mounted in the incorrect vertical
orientation, the probability of tipping increases with the possibility of injury
to personnel.
Electrical requirements
Grounding
To protect users, the cabinet is grounded through the three-conductor power
line cord in accordance with International Electrotechnical Commission (IEC)
requirements.
Figure 27
ALS controller orientation
Horizontal recommended
Vertical
Safety hazard
Start
Stop
ALS Controller
ALS Controller
CN00000XXX
G2912A
Serial #
Start
Stop
ALS Controller
ALS Controller
CN00000XXX
G2912A
Serial #
Start
Stop
ALS Controller
ALS Controller
CN00000XXX
G2912A
Serial #
C A U T I O N
A proper earth ground is required.
Содержание agilent 7683B
Страница 1: ...Agilent Technologies Agilent 7683B Automatic Liquid Sampler Installation Operation and Maintenance...
Страница 10: ...10 Installation Operation and Maintenance...
Страница 18: ...18 Installation Operation and Maintenance...
Страница 70: ...70 Installation Operation and Maintenance Part 1 Installation 2 Installation...
Страница 72: ...72 Installation Operation and Maintenance...
Страница 128: ...128 Installation Operation and Maintenance Part 2 Operation 6 Vials and Bottles...
Страница 166: ...166 Installation Operation and Maintenance Part 3 Maintenance and Troubleshooting 9 Faults and Errors...
Страница 202: ...202 Installation Operation and Maintenance A Cables and Connectors...