
1-4
Getting Started
Inspecting the Shipment
Inspecting the Shipment
1
Verify that all components ordered have arrived by comparing the shipping
forms to the original purchase order. Inspect all shipping containers.
If your shipment is damaged or incomplete, save the packing materials and
notify both the shipping carrier and the nearest Agilent Technologies sales and
service office. Agilent Technologies will arrange for repair or replacement of
damaged or incomplete shipments without waiting for a settlement from the
transportation company. Notify the Agilent Technologies customer engineer of
any problems.
2
Make sure that the serial number and options listed on the instrument’s rear-
panel label match the serial number and options listed on the shipping
document. The following figure is an example of the rear-panel serial number
label.
Figure 1-1. Serial number label
Содержание 83400 Series
Страница 2: ...Agilent 83400 Series Lightwave Source and Receiver Modules User s Guide ...
Страница 6: ...v Laser Classification IEC and FDA labels and their placement on an Agilent 83402C ...
Страница 9: ......
Страница 11: ......
Страница 17: ...1 6 Getting Started Connecting a Source Figure 1 2 Location of laser safety labels ...
Страница 47: ...2 24 General Information Theory of Operation Figure 2 13 Agilent 83410C and 83412B block diagram ...
Страница 66: ...3 15 Specifications and Regulatory Information Regulatory Information Declaration of conformity sources ...
Страница 67: ...3 16 Specifications and Regulatory Information Regulatory Information Declaration of conformity receivers ...
Страница 81: ...Index 4 Index width spectral procedure 4 4 Y YAG system dual hetrodyne 4 7 ...