
Installation Guide: Flame Ionization Detector (FID)
11
6
Secure the module with a 1-3/4-inch screw. The screw passes
through a hole at the center of the rear of the flow module.
7
Refer to your 6820
Getting Started
or
Service
manual both
for factory standard plumbing configurations and for proper
swage techniques to connect hydrogen and air supply gases
to the installed detector flow module.
Installing the Ignitor Extension Cable
Installing ignitor wiring for this new FID depends upon whether
this FID is the first FID installed on the GC, or if this FID is
being installed as a replacement or as a second FID:
•
If this is the first FID installed on the GC, continue with the
following procedure to install the ignitor extension cable.
General representation