
W
HEATHEART
- X-S
ERIES
13" A
UGERS
3. A
SSEMBLY
X130-74, X130-84, X130-94
3.10. A
UGER
T
UBE
T
RUSS
A
SSEMBLY
30787 R2
39
I
NSTALL
THE
X130-74 T
RUSS
C
ABLES
There are two cable runs on the X130-74, a long cable run between the upper
tube and the lower tube, and a short cable run between the lower tube and the
upper middle tube:
• The first (short) run is made up of a single 73’ cable.
• The second (long) run is made up of two separate cables: one 85’ 6” long
and one 36’ long.
See Table 3.8. for a list of parts required to install the X130-74 truss cables. See
Figure 3.13 for a detailed diagram.
Note:
X130-74 truss cables should be tightened to provide a 1” upward bow in the
auger tube, as measured at the auger tube spout end.
1. Ensure that the tube is supported by at least 3 stands (one at each end and
one in the middle).
2. Shim the stands (use wood blocks) at the spout end approximately
7” (17.8 cm) higher than the other stands to provide the required curve.
3. For the first (short) cable run, attach an eyebolt to each end of the 73’ truss
cable using two 3/8” cable clamps, doubling-back about
12” (30.5 cm) of cable.
4. Connect one of the eyebolts to one side of the truss cable attach bracket
using a 1/2” locknut threaded fully onto the eyebolt shaft, but not further than
1/4”.
5. Pull the cable:
• over the high (middle) truss tower,
• under the tube and around the middle cable return bracket,
• back over the middle cable bridge,
• and back to the truss cable attach bracket
6. Connect the second eyebolt on the remaining end of the cable to the other
side of the truss cable attach bracket using a 1/2” locknut threaded fully onto
the eyebolt shaft, but not further than 1/4”.
7. For the second (long) cable run:
• Thread the 36’ cable through the cable guide on the underside of the
lower tube, and pull the cable through until there is an equal length of
cable on each side of the tube.
Table 3.8. Parts Required, X130-74 Truss Cables
Part Number
Description
Amount
27502
73’ cable
1
27503
85’ 6” cable
1
20090
36’ cable
1
17464
Turnbuckle
2
19331
1/2” eyebolts
6
18990
3/8” cable clamps
12
19333
5/16” cable clamps
10
17750
1/2” locknuts
6
Содержание WHEATHEART X Series
Страница 6: ...WHEATHEART X SERIES 13 AUGERS X130 74 X130 84 X130 94 6 30787 R2 ...
Страница 12: ...1 INTRODUCTION WHEATHEART X SERIES 13 AUGERS 1 1 OVERVIEW X130 74 X130 84 X130 94 12 30787 R2 ...
Страница 24: ...2 SAFETY WHEATHEART X SERIES 13 AUGERS 2 10 SAFETY DECALS X130 74 X130 84 X130 94 24 30787 R2 ...
Страница 78: ...3 ASSEMBLY WHEATHEART X SERIES 13 AUGERS 3 20 AUGER TO TRACTOR HOOKUP X130 74 X130 84 X130 94 78 30787 R2 ...
Страница 100: ...6 OPERATION WHEATHEART X SERIES 13 AUGERS 6 3 OPERATING PROCEDURES X130 74 X130 84 X130 94 100 30787 R2 ...
Страница 114: ...7 MAINTENANCE WHEATHEART X SERIES 13 AUGERS 7 3 MAINTENANCE PROCEDURES X130 74 X130 84 X130 94 114 30787 R2 ...
Страница 116: ...8 STORAGE WHEATHEART X SERIES 13 AUGERS X130 74 X130 84 X130 94 116 30787 R2 ...
Страница 118: ...9 TROUBLESHOOTING WHEATHEART X SERIES 13 AUGERS X130 74 X130 84 X130 94 118 30787 R2 ...
Страница 122: ...10 APPENDIX WHEATHEART X SERIES 13 AUGERS 10 2 BOLT TORQUE VALUES X130 74 X130 84 X130 94 122 30787 R2 ...
Страница 124: ......